国家科技支撑项目(2006BAC19B01);江苏省科技支撑计划—社会发展项目(BE2008674)
陈卫,武迪,朱宁伟,郑晓英,李激,羊鹏程. A/A/O-MBR组合工艺强化去除氨氮及其硝化速率[J].土木与环境工程学报(中英文),2010,32(4):90-95. CHEN Wei, WU Di, ZHU Ningwei, ZHENG Xiaoying, LI Ji, YANG Pengcheng. Enhanced Ammonia Removal and Nitrification Rate of A/A/OMBR Combined Process[J]. JOURNAL OF CIVIL AND ENVIRONMENTAL ENGINEERING,2010,32(4):90-95.10.11835/j. issn.1674-4764.2010.04.018
复制