Abstract
The importance of delay, or retardation in the rate of fatigue crack growth, produced by load interactions in variable amplitude loading on the accurate prediction of fatigue lives of engineering structures has been well recognized for some time. Heretofore, only a few simple loading combinations or spectra have been examined systematically. In this investigation the effects of a broad range of loading variables on delay in fatigue crack growth at room temperature are examined for a mill annealed Ti-6A1-4V alloy. The results are used to estimate crack growth behavior under programmed loads.
Résumé
On a reconnu depuis quelque temps l'importance que revêt, pour une prédiction fiable de l'endurance en fatigue des éléments de construction, le ralentissement dans la vitesse de propagation des fissures de fatigue, résultant d'interaction des charges lorsque celles-ci sont d'amplitudes variables.
Jusqu'à présent, seul un petit nombre de combinaisons de charges ou de spectres ont fait l'objet d'un examen systématique. Dans la présente étude, on a étudié les effets d'une gamme étendue de variations de la charge sur le retard à la propagation des fissures de fatigue à température ambiante, dans le cas d'un alliage Ti-6A1-4V recuit.
Les résultats de cette étude sont appliqués à l'estimation de l'extension des fissures de fatigue sous des programmes collectifs de charges.
Zusammenfassung
Die Wichtigkeit des Einflusses des Aufschiebung oder Verspätung der Ausdehnungsgeschwindigkeit eines Müdigkeitrisses, unter Belastung mit wechselnder Amplitude, durch gegenseitige Beeinflussung der Lasten, auf die genaue Voraussagung der Müdigkeitslebensdauer von Bauelementen ist seit einer gewissen Zeit gut bekannt.
Bis jetzt wurden nur einige einfachen Belastungsfälle oder Kollektive systematisch untersucht. In diesem Bericht wird der Einfluss von einer grossen Anzahl Belastungsveränderlichen auf die Verspätung der Ausdehnungsge-schwindigkeit eines Müdigkeitrisses bei Zimmertemperatur untersucht, für einen geglühten Ti-6A1-4V legierten Stahl. Die Ergebnisse werden gebraucht um die Rissausdehnung unter einem Belastungskollektiv vorauszusagen.
Similar content being viewed by others
References
R. H. Christensen,Proceedings—Crack Propagation Symposium, Cranfield, College of Aeronautics, (1962).
J. Schijve,Fatigue Crack Propagation in Light Alloy Sheet Material and Structures, Rept. MP 195, Nationaal Luchtvaartlaboratorium (Amsterdam), (August 1960).
C. M. Hudson and H. F. Hardrath,NASA TN D-960, (1961).
C. M. Hudson and K. N. Raju,NASA TN D-5702, (1970).
J. P. Butler, The Material Selection and Structural Development Process for Aircraft Structural Integrity under Fatigue Conditions,AFFDL TR-70-144 (1970), 17.
O. Jonáš and R. P. Wei,Int. J. Fract. Mech., 7 (1971), 116–118.
H. A. Wood and T. L. Haglage,AFFDL-TM-71-2-FBR (January 1971).
H. A. Wood, T. L. Haglage and R. M. Engle, Jr.,AFFDL-TM-71-3-FBR (1971).
O. E. Wheeler, Spectrum Loading and Crack Growth,ASME Paper No. 71-Met-X, (1971).
J. Willenborg, R. M. Engle, Jr. and H. A. Wood,AFFDL-TM-71-1-FBR (January 1971).
W. Elber,ASTM STP 486 (1971).
R. P. Wei,Effects of Temperature and Environment on Delay in Fatigue Crack Growth, in manuscript (1972).
W. F. Brown, Jr. and J. E. Srawley,ASTM STP 410 (1966).
P. C. Paris and G. C. Sih,ASTM STP 381 (1965).
G. C. Sih,NASA-TR-71-8, Lehigh University (1971).
R. J. Hartranft and G. C. Sih,J. Math. Mechanics, 19 (1969), 123.
F. W. Smith, A. F. Emery and A. S. Kobayashi,J. Appl. Mech., 34 (1967), 953.
G. R. Irwin,J. Appl. Mech., 29 (1962), 651.
H. H. Johnson,Mat. Res. and Stds., 4,ASTM (1965), 442.
Che-Yu Li and R. P. Wei,Mat. Res. and Stds., 6,ASTM (1966), 392.
R. P. Wei and D. L. Ritter,J. of Materials, 1,ASTM, 240 (1972).
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Wei, R.P., Shih, T.T. Delay in fatigue crack growth. Int J Fract 10, 77–85 (1974). https://doi.org/10.1007/BF00955082
Received:
Issue Date:
DOI: https://doi.org/10.1007/BF00955082