Published June 6, 2017
| Version v1
Project deliverable
Open
D2.3: Interim Pilot Progress Report
- 1. BR
- 2. BBC
- 3. ECANDY
- 4. TRINNOV
Description
This document describes the current status of Orpheus pilot phase 1, which has been divided into three stages. The first stage is a live production of an interactive object-based radio drama that can be experienced using a web browser. The second is a selection of material encoded using MPEG-H and made available through an iPhone and AV receiver. The third is an ‘as-live’ broadcast, live encoded using MPEG-H and made available over the Internet.
Files
Orpheus-D2.3_Interim Pilot Progress Report.pdf
Files
(1.1 MB)
Name | Size | Download all |
---|---|---|
md5:3bb36d4e11fcdc4c1ff6e615f8c583ee
|
1.1 MB | Preview Download |