Published January 27, 2021 | Version v1
Project deliverable Open

D14.1– Mid-term interim report on the ARIADNEplus knowledge management system

  • 1. FORTH
  • 1. FORTH
  • 2. PIN
  • 3. USW
  • 4. OEAW
  • 5. UoY-ADS

Description

This deliverable describes the activities carried out during the first half of the ARIADNEplus project within Work Package 14 (WP14 - JRA3 - The ARIADNEplus knowledge management system) by the partners and describes the results achieved by this work package. The report describes progress in:

● Task 14.1 – Monitoring knowledge integration (JRA3.1)

● Task 14.2 – Application profiles (JRA3.2)

● Task 14.3 – Vocabularies and gazetteers (JRA3.3)

In the first half of the project and the interim assessment produced by:

● Task 14.4 – Assessing the CRM extensions (JRA3.4)

The overall objectives of WP14 are presented in Section 2 while Sections 3, 4, 5 and 6 present the detailed work in Tasks 14.1, 14.2, 14.3 and 14.4 respectively. All sections follow the same structure providing an overview, the actual work achieved by the task, the deviation (if any) from the work plan and the plans for the next period. Work in WP14 is closely related to other work packages and more specifically to WP4 where the ARIADNEplus ontology and specific extensions, the application profiles, to specific sub-domains of archaeology and archaeological science, are being implemented. Deliverable D4.2 - Initial report on ontology implementation was submitted previously and provides a detailed description of the AO-Cat (the ARIADNE ontology) and the progress on the application profiles. This work is closely related to Task 14.2, so direct references in D4.2 will be provided whenever needed.

Notes

All ARIADNEplus deliverables are available at: https://ariadne-infrastructure.eu/resources/ariadneplus-deliverables/

Files

D14.1 Mid-term interim report.pdf

Files (1.4 MB)

Name Size Download all
md5:cb270324b9c9ddc0411312a50568813f
1.4 MB Preview Download