Title: LCLS Undulator Quadrupole Fiducialization Plan

Technical Report ·
DOI:https://doi.org/10.2172/993415· OSTI ID:993415

This note presents the fiducialization plan for the LCLS undulator quadrupoles. The note begins by summarizing the requirements for the fiducialization. A discussion of the measurement equipment is presented, followed by the methods used to perform the fiducialization and check the results. This is followed by the detailed fiducialization plan in which each step is enumerated. Finally, the measurement results and data storage formats are presented. The LCLS is made up of 33 assemblies consisting of an undulator, quadrupole, beam finder wire, and other components mounted on a girder. The components must be mounted in such a way that the beam passes down the axis of each component. In this note, we describe how the ideal beam axis is related to tooling balls on the quadrupole. This step, called fiducialization, is necessary because the ideal beam axis is determined magnetically, whereas tangible objects must be used to locate the quadrupole. The note begins with the list of fiducialization requirements. The laboratory in which the work will be performed and the relevant equipment is then briefly described. This is followed by a discussion of the methods used to perform the fiducialization and the methods used to check the results. A detailed fiducialization plan is presented in which all the steps of fiducialization are enumerated. A discussion of the resulting data files and directory structure concludes the note.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-76SF00515
OSTI ID:
993415
Report Number(s):
SLAC-TN-10-047; TRN: US1008131
Country of Publication:
United States
Language:
English

Similar Records

LCLS Undulator Fiducialization Plan
Technical Report · Wed Nov 24 00:00:00 EST 2010 · OSTI ID:993415

Girder Alignment Plan
Technical Report · Thu Nov 18 00:00:00 EST 2010 · OSTI ID:993415

LCLS Undulator Test Plan
Technical Report · Wed Nov 24 00:00:00 EST 2010 · OSTI ID:993415