Title: SPECIAL ANALYSIS OF OPERATIONAL STORMWATER RUNOFF COVERS OVER SLIT TRENCHES

Technical Report ·
DOI:https://doi.org/10.2172/946161· OSTI ID:946161

Solid Waste Management (SWM) commissioned this Special Analysis (SA) to determine the effects of placing operational stormwater runoff covers (referred to as covers in the remainder of this document) over slit trench (ST) disposal units ST1 through ST7 (the center set of slit trenches). Previously the United States Department of Energy (DOE) entered into an agreement with the United States Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC) to place covers over Slit Trenches 1 and 2 to be able to continue disposing Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) solid waste (see USDOE 2008). Because the covers changed the operating conditions, DOE Order 435.1 (DOE 1999) required that an SA be performed to assess the impact. This Special Analysis has been prepared to determine the effects of placing covers over slit trenches at about years 5, 10 and 15 of the 30-year operational period. Because some slit trenches have already been operational for about 15 years, results from analyzing covers at 5 years and 10 years provide trend analysis information only. This SA also examined alternatives of covering Slit Trenches 1 and 2 with one cover and Slit Trenches 3 and 4 with a second cover versus covering them all with a single cover. Based on modeling results, minimal differences exist between covering Slit Trench groups 1-2 and 3-4 with two covers or one large cover. This SA demonstrates that placement of covers over slit trenches will slow the subsequent release and transport of radionuclides in the vadose zone in the early time periods (from time of placement until about 100 years). Release and transport of some radionuclides in the vadose zone beyond 100 years were somewhat higher than for the case without covers. The sums-of-fractions (SOFs) were examined for the current waste inventory in ST1 and ST2 and for estimated inventories at closure for ST3 through ST7. In all cases SOFs were less than one (except for one SOF for ST5 that remained at one), indicating that there should be no unacceptable impacts on operations from placing covers for the cover alternatives that were analyzed. Minimal operational limits provided in Table 4 should be used as the new set of limits for Slit Trenches 1 through 7. ST1 and ST2 are expected to be covered about 15 years after the first disposal in ST1. Because the time of actual placement of covers over the other slit trenches is unknown, this SA did not consider limit increases, only limit decreases. Thus, each minimal operational limit is the minimum of the Performance Assessment (PA) final limit and the limit calculated in this SA if covers were placed at about 5, 10 or 15 years. If other cover times are desired, further analysis will be required.

Research Organization:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
DE-AC09-08SR22470
OSTI ID:
946161
Report Number(s):
SRNL-STI-2008-00397; TRN: US200904%%235
Country of Publication:
United States
Language:
English