skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Cleanup Verification Package for the 118-C-1, 105-C Solid Waste Burial Ground

Abstract

This cleanup verification package documents completion of remedial action for the 118-C-1, 105-C Solid Waste Burial Ground. This waste site was the primary burial ground for general wastes from the operation of the 105-C Reactor and received process tubes, aluminum fuel spacers, control rods, reactor hardware, spent nuclear fuel and soft wastes.

Authors:
Publication Date:
Research Org.:
Washington Closure Hanford
Sponsoring Org.:
USDOE
OSTI Identifier:
945295
Report Number(s):
CVP-2006-00011, Rev. 0
TRN: US0901192
DOE Contract Number:  
DE-AC06-05RL14655
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES; 54 ENVIRONMENTAL SCIENCES; ALUMINIUM; CONTROL ELEMENTS; NUCLEAR FUELS; REMEDIAL ACTION; SOLID WASTES; SPACERS; VERIFICATION; WASTES; SPENT FUELS; Hanford; 100B/C Area; 118-C-1 Waste Site; 105-C Solid Waste Burial Ground; 105-C Reactor; process tubes; aluminum fuel spacers; control rods; reactor hardware; spent nuclear fuel

Citation Formats

M. J. Appel and J. M. Capron. Cleanup Verification Package for the 118-C-1, 105-C Solid Waste Burial Ground. United States: N. p., 2007. Web. doi:10.2172/945295.
M. J. Appel and J. M. Capron. Cleanup Verification Package for the 118-C-1, 105-C Solid Waste Burial Ground. United States. https://doi.org/10.2172/945295
M. J. Appel and J. M. Capron. 2007. "Cleanup Verification Package for the 118-C-1, 105-C Solid Waste Burial Ground". United States. https://doi.org/10.2172/945295. https://www.osti.gov/servlets/purl/945295.
@article{osti_945295,
title = {Cleanup Verification Package for the 118-C-1, 105-C Solid Waste Burial Ground},
author = {M. J. Appel and J. M. Capron},
abstractNote = {This cleanup verification package documents completion of remedial action for the 118-C-1, 105-C Solid Waste Burial Ground. This waste site was the primary burial ground for general wastes from the operation of the 105-C Reactor and received process tubes, aluminum fuel spacers, control rods, reactor hardware, spent nuclear fuel and soft wastes.},
doi = {10.2172/945295},
url = {https://www.osti.gov/biblio/945295}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Jul 25 00:00:00 EDT 2007},
month = {Wed Jul 25 00:00:00 EDT 2007}
}