236-Z and 291-Z Vacuum Pump System Pressure Drop Analysis for Line Size Selection
No abstract prepared.
- Research Organization:
- Fluor Hanford, Richland, WA (United States)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 803649
- Report Number(s):
- HNF-6328, Rev.0; EDT-627558; TRN: US0301593
- Resource Relation:
- Other Information: PBD: 16 May 2000
- Country of Publication:
- United States
- Language:
- English
Similar Records
236-Z and 291-Z Vacuum Pump System Flow Determination
Reotemp pressure indicator - local pressure indication to monitor the SCHe purge line pressure after the PRV
Detailed design data package: 3.1a-Film cooler pressure drop data; Item 3.2a - SBS packing selection; Item 3.2b, 3.2c - Pressure drop data for SBS distribution plate; and Item 3.2e - SBS distribution plate and liquid risers. PHTD pilot-scale melter testing system cost account milesonte 1.2.2.04.15A
Technical Report
·
Tue May 16 00:00:00 EDT 2000
·
OSTI ID:803649
Reotemp pressure indicator - local pressure indication to monitor the SCHe purge line pressure after the PRV
Technical Report
·
Thu May 13 00:00:00 EDT 1999
·
OSTI ID:803649
Detailed design data package: 3.1a-Film cooler pressure drop data; Item 3.2a - SBS packing selection; Item 3.2b, 3.2c - Pressure drop data for SBS distribution plate; and Item 3.2e - SBS distribution plate and liquid risers. PHTD pilot-scale melter testing system cost account milesonte 1.2.2.04.15A
Technical Report
·
Fri Mar 01 00:00:00 EST 1996
·
OSTI ID:803649