Evaluation of 3 Inch SN-219 Failure and S and SX Tank Farm Saltwell Piping
Evaluation of direct buried piping currently in use or designated for future Saltwell pumping in S and SX Farms. Documented evaluation of failed S-103 saltwell pumping transfer line 3 inch SN-219. This evaluation is intended to reflect current status of Saltwell piping, when taken in context with referenced documents.
- Research Organization:
- CH2M Hill Hanford Group, Inc., Richland, WA (United States)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC27-99RL14047
- OSTI ID:
- 801352
- Report Number(s):
- RPP-5825, Rev.0; EDT-627870; TRN: US0300382
- Resource Relation:
- Other Information: PBD: 11 Feb 2000
- Country of Publication:
- United States
- Language:
- English
Similar Records
S Tank Farm SL-119 saltwell piping failure analysis report
Evaluation of Failed Crane Chempumps Used During Salt Well Pumping
ALARACT Demonstration for Primary Ventilation Systems at the DST Tank Farms for the Interim Stabilization Project (Saltwell Pumping) [SEC 1 Thru 3]
Technical Report
·
Fri Aug 05 00:00:00 EDT 1994
·
OSTI ID:801352
Evaluation of Failed Crane Chempumps Used During Salt Well Pumping
Technical Report
·
Mon Sep 18 00:00:00 EDT 2000
·
OSTI ID:801352
ALARACT Demonstration for Primary Ventilation Systems at the DST Tank Farms for the Interim Stabilization Project (Saltwell Pumping) [SEC 1 Thru 3]
Technical Report
·
Tue Jan 08 00:00:00 EST 2002
·
OSTI ID:801352