skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Plutonium Finishing Plant (PFP) HVAC System Component Index

Technical Report ·
DOI:https://doi.org/10.2172/801318· OSTI ID:801318

The Plutonium Finishing Plant (PFP) WAC System includes sub-systems 25A through 25K. Specific system boundaries and justifications are contained in HNF-SD-CP-SDD-005, ''Definition and Means of Maintaining the Ventilation System Confinement Portion of the PFP Safety Envelope.'' The procurement requirements associated with the system necessitates procurement of some system equipment as Commercial Grade Items in accordance with HNF-PRO-268, ''Control of Purchased Items and Services.'' This document lists safety class and safety significant components for the Heating Ventilation Air Conditioning and specifies the critical characteristics for Commercial Grade Items, as required by HNF-PRO-268 and HNF-PRO-1819. These are the minimum specifications that the equipment must meet in order to properly perform its safety function. There may be several manufacturers or models that meet the critical characteristics for any one item.

Research Organization:
Fluor Hanford, Richland, WA (United States)
Sponsoring Organization:
ENVIRONMENTAL MANAGEMENT (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
801318
Report Number(s):
HNF-5186, Rev.1; ECN-657656; TRN: US200301%%664
Resource Relation:
Other Information: PBD: 28 Feb 2000
Country of Publication:
United States
Language:
English