Title: Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.

Abstract

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This projectmore » calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old project that will protect an additional 1.3 miles of stream and 298.3 acres of habitat; (2) Conducting instream work activities in 3 streams to enhance habitat and/or restore natural channel dimensions, patterns or profiles; (3) Improving fish passage in Bear Creek to restore tributary and mainstem access; (4) Planting and seeding 6.7 stream miles with 7,100 plants and 365 lbs. of seed; (5) Establishing 18 new photopoints and retaking 229 existing photopoint pictures; (6) Monitoring stream temperatures at 12 locations on 6 streams; (7) completing riparian fence, water gap and other maintenance on 98.7 miles of project fences. Since initiation of the project in 1984 over 62 miles of anadromous fish bearing streams and 1,910 acres of habitat have been protected, enhanced and maintained.« less

Authors:
; ;
Publication Date:
Research Org.:
Oregon Department of Fish and Wildlife
Sponsoring Org.:
US Bonneville Power Administration
OSTI Identifier:
782928
Report Number(s):
DOE/BP-00000628-2
Contract 00000628; TRN: AH200127%%191
DOE Contract Number:  
DE-BI79-84BP16114; 99BI16565
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 1 Apr 2001
Country of Publication:
United States
Language:
English
Subject:
13 HYDRO ENERGY; 54 ENVIRONMENTAL SCIENCES; BEARINGS; BONNEVILLE POWER ADMINISTRATION; COLUMBIA RIVER; COLUMBIA RIVER BASIN; DRAINAGE; ECOSYSTEMS; HABITAT; IMPLEMENTATION; WATERSHEDS; HYDROELECTRIC POWER PLANTS; FISH HABITAT IMPROVEMENT - GRANDE RONDE RIVER (OR. AND WASH.)

Citation Formats

McGowan, Vance R, Powell, Russ M, and Stennfeld, Scott P. Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.. United States: N. p., 2001. Web. doi:10.2172/782928.
McGowan, Vance R, Powell, Russ M, & Stennfeld, Scott P. Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.. United States. https://doi.org/10.2172/782928
McGowan, Vance R, Powell, Russ M, and Stennfeld, Scott P. 2001. "Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.". United States. https://doi.org/10.2172/782928. https://www.osti.gov/servlets/purl/782928.
@article{osti_782928,
title = {Grande Ronde Basin Fish Habitat Enhancement Project : 2000 Annual Report.},
author = {McGowan, Vance R and Powell, Russ M and Stennfeld, Scott P},
abstractNote = {On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of ''The Grande Ronde Basin Fish Habitat Enhancement Project'' is to access, create, improve, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian enclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2000 included: (1) Implementing 2 new projects in the Grande Ronde drainage, and retrofitting one old project that will protect an additional 1.3 miles of stream and 298.3 acres of habitat; (2) Conducting instream work activities in 3 streams to enhance habitat and/or restore natural channel dimensions, patterns or profiles; (3) Improving fish passage in Bear Creek to restore tributary and mainstem access; (4) Planting and seeding 6.7 stream miles with 7,100 plants and 365 lbs. of seed; (5) Establishing 18 new photopoints and retaking 229 existing photopoint pictures; (6) Monitoring stream temperatures at 12 locations on 6 streams; (7) completing riparian fence, water gap and other maintenance on 98.7 miles of project fences. Since initiation of the project in 1984 over 62 miles of anadromous fish bearing streams and 1,910 acres of habitat have been protected, enhanced and maintained.},
doi = {10.2172/782928},
url = {https://www.osti.gov/biblio/782928}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Sun Apr 01 00:00:00 EST 2001},
month = {Sun Apr 01 00:00:00 EST 2001}
}