Waste Isolation Pilot Plant TruDock crane system analysis
- Westinghouse Electric Corp., Pittsburgh, PA (United States)
- Westinghouse Electric Corp., Carlsbad, NM (United States). Waste Isolation Div.
The WIPP TruDock crane system located in the Waste Handling Building was identified in the WIPP Safety Analysis Report (SAR), November 1995, as a potential accident concern due to failures which could result in a dropped load. The objective of this analysis is to evaluate the frequency of failure of the TruDock crane system resulting in a dropped load and subsequent loss of primary containment, i.e. drum failure. The frequency of dropped loads was estimated to be 9.81E-03/year or approximately one every 102 years (or, for the 25% contingency, 7.36E-03/year or approximately one every 136 years). The dominant accident contributor was the failure of the cable/hook assemblies, based on failure data obtained from NUREG-0612, as analyzed by PLG, Inc. The WIPP crane system undergoes a rigorous test and maintenance program, crane operation is discontinued following any abnormality, and the crane operator and load spotter are required to be trained in safe crane operation, therefore it is felt that the WIPP crane performance will exceed the data presented in NUREG-0612 and the estimated failure frequency is felt to be conservative.
- Research Organization:
- Westinghouse Electric Corp., Pittsburgh, PA (United States); Westinghouse Electric Corp., Carlsbad, NM (United States). Waste Isolation Div.
- Sponsoring Organization:
- USDOE Office of Civilian Radioactive Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC04-86AL31950
- OSTI ID:
- 515491
- Report Number(s):
- WIPP/WID-96-2196; ON: DE97004466; TRN: 97:018285
- Resource Relation:
- Other Information: PBD: Oct 1996
- Country of Publication:
- United States
- Language:
- English