Project specific quality assurance plan project W-058 replacement cross-site transfer system
This is part of the Tank Waste Projects (TWP) Quality Assurance Program Plan. This document and the Tank Waste Projects QAPP describe the program and the planned actions which WHC will implement, demonstrate and ensure that the project meets the requirements of 10 CFR 830.120. Purpose of Project W058, Replacement Cross-Site Transfer System, is to replace the existing cross-site transfer system for transferring waste (via pipeline) in support of the Hanford Site clean-up mission. The transfers will be made from 200 East and 200 West tank farms to treatment, storage, and disposal facilities in the 200 East Area. The new system will consist of a pipe-in-pipe connecting the 241-SY A and B valve pits in the 200 West Area with the 244-A Lift Station in the 200 East Area. The work to be accomplished by W-058 and covered by this QAPP includes diversion box, vent station, piping, booster pump, backup flush system, power lines.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 492099
- Report Number(s):
- WHC-SD-W058-QAPP-001-Rev.3; ON: DE97052597; TRN: 97:018372
- Resource Relation:
- Other Information: PBD: 5 Feb 1996
- Country of Publication:
- United States
- Language:
- English
Similar Records
Functional design criteria for Project W-058, replacement of cross-site transfer system. Revision 2
Multi-function Waste Tank Facility path forward engineering analysis -- Technical Task 3.6, Estimate of operational risk in 200 West Area