Title: Utility Advanced Turbine System (ATS) technology readiness testing and pre-commercial demonstration phase 3. Quarterly progress report, October 1--December 31, 1995

Technical Report ·
DOI:https://doi.org/10.2172/486029· OSTI ID:486029

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the U.S. Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detailed design. Validation of critical components and technologies will be performed including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which will be sited and operated in Phase 4. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue.

Research Organization:
General Electric Co., Schenectady, NY (United States)
Sponsoring Organization:
USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
DOE Contract Number:
FC21-95MC31176
OSTI ID:
486029
Report Number(s):
DOE/MC/31176-5340; ON: DE97002088; TRN: 97:003912
Resource Relation:
Other Information: PBD: [1997]
Country of Publication:
United States
Language:
English