Title: Quarterly operating report. First quarter, 1975

Technical Report ·
DOI:https://doi.org/10.2172/4132521· OSTI ID:4132521

During the first quarter of 1975, the Shippingport Atomic Power Station remained shutdown for PWR/LWBR (Pressurized Water Reactor/Light Water Breeder Reactor) Core Conversion. Defueling operations continued throughout the quarter. A nitrogen purge of the upper reactor vessel was initiated on January 3, and then on January 10, the reactor vessel water level was lowered to a level between elevation 706'9'' and 707'2''. This level has been maintained the remainder of the quarter. The RWD gaseous waste system remained vented to atmosphere throughout the first quarter report period. (auth)

Research Organization:
Duquesne Light Co., Shippingport, Pa. (USA). Power Stations Dept.
DOE Contract Number:
AT(11-1)-292
NSA Number:
NSA-33-013934
OSTI ID:
4132521
Report Number(s):
DLCS-5000175
Resource Relation:
Other Information: Orig. Receipt Date: 30-JUN-76
Country of Publication:
United States
Language:
English