Title: Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report

Technical Report ·
DOI:https://doi.org/10.2172/146799· OSTI ID:146799
; ; ;  [1]
  1. Pacific Northwest Lab., Richland, WA (United States)

With the issuance of the final Decommissioning Rule (July 27, 1988), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the {prime}978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

Research Organization:
US Nuclear Regulatory Commission (NRC), Washington, DC (United States). Div. of Regulatory Applications; Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
Sponsoring Organization:
Nuclear Regulatory Commission, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
146799
Report Number(s):
NUREG/CR-5884-Vol.1; PNL-8742-Vol.1; ON: TI96001685; TRN: 96:001402
Resource Relation:
Other Information: PBD: Nov 1995