HLW flowsheet material balance for DWPF rad operation with Tank 51 sludge and ITP Cycle 1 precipitate
This document presents the details of the Savannah River Plant Flowsheet for the Rad Operation with Tank Sludge and ITP Cycle 1 Precipitate. Topics discussed include: material balance; radiolysis chemistry of tank precipitates; algorithm for ESP washing; chemistry of hydrogen and ammonia generation in CPC; batch sizes for processing feed; and total throughput of a streams during one cycle of operation.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC09-89SR18035
- OSTI ID:
- 146710
- Report Number(s):
- WSRC-TR-95-0019; ON: DE96004065; TRN: 96:001339
- Resource Relation:
- Other Information: PBD: 19 Apr 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS USING POST ALUMINUM DISSOLUTION TANK 51 SLUDGE SLURRY
Sludge batch 9 simulant runs using the nitric-glycolic acid flowsheet
Nuclear safety of extended sludge processing on tank 42 and 51 sludge (DWPF sludge feed batch one)
Technical Report
·
Mon Apr 28 00:00:00 EDT 2008
·
OSTI ID:146710
+3 more
Sludge batch 9 simulant runs using the nitric-glycolic acid flowsheet
Technical Report
·
Tue Nov 01 00:00:00 EDT 2016
·
OSTI ID:146710
+3 more
Nuclear safety of extended sludge processing on tank 42 and 51 sludge (DWPF sludge feed batch one)
Technical Report
·
Fri Feb 26 00:00:00 EST 1993
·
OSTI ID:146710