Groundwater activation calculations for E872
The E872 beam dump geometry has been modeled in CASIM and calculations have been done to determine the annual limits for protons n target. Results are presented using both the single resident well model (SRWM) and the newly-approved concentration model (CM). The conclusion is that the target/dump design is adequate for the maximum number of protons on target requested by the experiment, which is >1 {times} 10{sup 18} protons per year at 800 GeV.
- Research Organization:
- Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC02-76CH03000
- OSTI ID:
- 100256
- Report Number(s):
- FNAL-TM-1944; ON: DE95017051; TRN: 95:019442
- Resource Relation:
- Other Information: PBD: Aug 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
CASIM and ground water activation calculations at the A0 abort
Ground-water activation from the upcoming operation of MI40 beam absorber
Special Analysis of the Area 3 Radioactive Waste Management Site at the Nevada National Security Site, Nye County, Nevada
Technical Report
·
Mon May 15 00:00:00 EDT 2000
·
OSTI ID:100256
Ground-water activation from the upcoming operation of MI40 beam absorber
Technical Report
·
Sun Sep 01 00:00:00 EDT 1996
·
OSTI ID:100256
Special Analysis of the Area 3 Radioactive Waste Management Site at the Nevada National Security Site, Nye County, Nevada
Technical Report
·
Sun Sep 30 00:00:00 EDT 2012
·
OSTI ID:100256