ESTIVATE: a model for calculating excavator productivity and output costs

DAVID J. EDWARDS (The Built Environment Research Unit, School of Engineering and the Built Environment, University of Wolverhampton, Wulfruna Street, Wolverhampton, West Midlands WV1 1SB, UK)
GARY D. HOLT (The Built Environment Research Unit, School of Engineering and the Built Environment, University of Wolverhampton, Wulfruna Street, Wolverhampton, West Midlands WV1 1SB, UK)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 1 January 2000

513

Abstract

Hydraulic excavator cycle time and associated unit costs of excavation for given input estimating data, for machines operating in the UK construction industry, are predicted. Using multiple regression analysis, three variables are identified as accurate predictors of cycle time: machine weight, digging depth and machine swing angle. With a coefficient of determination (R2) of 0.88, a mean percentage error (MPE) of −5.49, and a mean absolute error (MAPE) of 3.67, the cycle time model is robust; this is further validated using chi‐square analysis and Pearson's correlation coefficient (on predicted and actual values of machine cycle time). An illustrative example of the model's application to determine machine productivity is given. The paper concludes with a spreadsheet model for calculating excavation costs (m3 and cost per h) which is able to deal with any combination of the three independent cycle time predictor variables and other estimator's input data.

Keywords

Citation

EDWARDS, D.J. and HOLT, G.D. (2000), "ESTIVATE: a model for calculating excavator productivity and output costs", Engineering, Construction and Architectural Management, Vol. 7 No. 1, pp. 52-62. https://doi.org/10.1108/eb021132