Abstract
CERN has a unique set of secondary beam lines, which deliver particles extracted from the PS and SPS accelerators after their interaction with a target material reaching energies up to 400 GeV. These beam lines provide a crucial contribution for test beam facilities, and host several fixed target experiments. A correct operation of the beam lines requires precise simulations of the beam optics and studies on the beam-matter interaction, radiation protection, beam equipment survival etc. BDSIM combines tracking studies with energy deposition and beam-matter interaction simulations within one software framework. This paper presents studies conducted on secondary beam lines with BDSIM for the beam lines T9 and T10. We report the tracking analysis and the energy deposition along the beam line. Tracking analysis validation is demonstrated via comparison to existing tracking codes.
Export citation and abstract BibTeX RIS
Content from this work may be used under the terms of the Creative Commons Attribution 3.0 licence. Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.