First optics and beam dynamics studies on the MAX IV 3 GeV storage ring

https://doi.org/10.1016/j.nima.2017.11.072Get rights and content

Abstract

The MAX IV 3  GeV storage ring is the first light source to make use of a multibend achromat lattice to reach ultralow emittance. After extensive commissioning efforts, the storage ring is now ramping up its user program. We present results from beam commissioning of the MAX IV 3 GeV storage ring as well as a summary of the beam dynamics studies that have so for been carried out. We report on injection and accumulation using a single dipole kicker, top-up injection, slow orbit feedback, restoring the linear optics to design, effects of in-vacuum undulators with closed gaps, adjusting nonlinear optics to achieve design chromaticity correction and dynamic aperture sufficient for high injection efficiency and large Touschek lifetime.

Introduction

The MAX IV 3 GeV storage ring is the first light source to make use of a multibend achromat lattice to reach ultralow emittance. First ideas for what would become the MAX IV 3 GeV storage ring were discussed as early as 2002 [[1], [2]] but design efforts intensified during 2006–2009 [3]. Funding for the MAX IV facility was granted in April 2009 and construction started during the summer of 2010. In March 2014, commissioning of the MAX IV linac started with the RF conditioning of the 19 RF stations. Actual beam commissioning of the MAX IV linac started in summer 2014 and lasted until April 2015 when the transfer line to the 3 GeV storage ring was installed. Beam commissioning in the MAX IV 3 GeV storage ring started in August 2015 [[4], [5]]. The MAX IV facility was inaugurated on June 21, 2016 and the first user data was taken in December 2016.

This paper summarizes the events and first results of beam commissioning in the MAX IV 3 GeV storage ring. The next two subsections cover design optics and injection. They are followed by a subsection summarizing the timeline of events during commissioning. The following sections then cover initial injection, orbit measurement and control, linear optics tuning, chromaticity measurement and nonlinear optics tuning, and a few first results concerning emittance, coupling, and lifetime. The final section shall give an overall summary and point out the next studies to be conducted.

The MAX IV 3 GeV storage ring employs a multibend achromat lattice to reach ultralow emittance. An initial lattice was published in [6] and used as the baseline lattice for the Detailed Design Report released in 2010 [3]. This design was later improved and studied in more detail[[7], [8], [9], [10], [11], [12]]. Here we shall not go into any lattice details. Instead, the optics and magnetic lattice are displayed in Fig. 1 and the most important storage ring parameters are summarized in Table 1.

The design of the MAX IV 3 GeV storage ring foresees use of a nonlinear kicker magnet for full-energy injection from the MAX IV linac [13]. However, from its inception, this injection was considered too demanding for the first stages of commissioning. Therefore, an injection based on a single dipole kicker was designed [14] and implemented in the MAX IV 3 GeV storage ring. The main idea is to rely on an individual dipole kicker in order to inject both on- and off-axis, as well as to enable accumulation in the storage ring without, however, having to require tight orbit and optics control as in the case of a nonlinear kicker injection scheme. Furthermore, the dipole injection kicker has been installed very close to the injection point (IP) which is defined as the magnetic end of the Lambertson septum, in order to further increase the robustness of injection during initial phases of commissioning.

Details for this injection scheme have been published in [14] and shall not be repeated here. Instead, Fig. 2 shows where the dipole injection kicker is located in the storage ring, as well as the trajectories for the injected and any already stored beam. The dipole injection kicker is excited using a half sine with a base length of 3.5μs (corresponding to two revolution periods). The situation displayed in Fig. 2 corresponds to beam accumulation. For initial commissioning, on-axis injection was desired. This can be accomplished by slightly angling the beam at the IP and increasing the injection kick strength.

Beam commissioning in the MAX IV 3 GeV storage ring started in August 2015 when for the first time electron bunches were guided from the linac extraction area all the way through the 3 GeV transfer line to the Lambertson septum in the storage ring. By August 25 the first turn in the storage ring was recorded and first stored beam was achieved on September 15. First stacking was demonstrated on October 8. This then allowed many orbit and optics studies to be carried out in the bare machine. On November 2 first light was observed on the first diagnostic beamline in the storage ring. By the end of November top-up injection was being applied and the slow orbit feedback (SOFB) loop had been closed.

A first shutdown took place in February 2016 in order to install the first two insertion devices (IDs): two 18 mm period in-vacuum undulators (IVUs) from Hitachi. Once these devices had been commissioned with beam, commissioning of the first two beamlines (frontends, beamline transport, end stations) could be carried out. These two initial beamlines had monochromatic beams at 11 keV in mid May. In June they took first diffraction patterns and by the end of June the gaps had been closed to 4.5 mm. The MAX IV facility was inaugurated on June 21, 2016. During the summer 2016 shutdown the next three IDs were installed: an in-vacuum wiggler (IVW) and two elliptically polarized undulators (EPUs) along with their narrow-gap chambers. By the end of 2016, the two IVU beamlines were routinely taking delivery of 50 mA of beam for beamline commissioning and first experiments, while 198 mA of stored beam had been reached during machine shifts.

This paper will not report on the commissioning of various sub-systems as this can be found elsewhere, e.g. [[15], [16], [17], [18], [19], [20], [21]]. The following sections will instead focus entirely on beam commissioning results and tuning efforts.

Section snippets

Initial injection & orbit control

Initially, when first electron bunches were guided through the 3 GeV transfer line [13], the signals from the single-pass BPM units installed along the transfer line could be used for beam threading. Once sufficient amounts of charge could be transported all the way to the end of the transfer line, the excitations of the vertical dipoles in the transfer line revealed the extraction energy by fitting to magnetic measurement data. Furthermore, a screen that can be inserted in the high-dispersion

Linear optics tuning

As indicated in Section 2.3, the integer tunes could be confirmed during early commissioning. With the orbit well corrected, it then became of interest to measure fractional tunes and optical functions. At the time of writing, there exist three independent methods to measure the fractional tunes in the MAX IV 3 GeV storage ring: applying an FFT on turn-by-turn data from BPMs after exciting the beam with the dipole kicker or pinger, using a spectrum analyzer connected to two pairs of striplines

Nonlinear optics tuning

The chromaticity has been determined by measuring the fractional betatron tunes for various ring RF settings. As explained in Section 2.6, the ring RF can be adjusted to ensure it is matched to the energy defined by the main dipole fields. At this point, the RF can be shifted and a corresponding change in associated energy calculated using the model momentum compaction. From this data the chromaticity is then fitted. An example for such a measurement is displayed in Fig. 19. As can be seen from

Coupling, emittance & lifetime

In a later phase of commissioning the LOCO procedure was repeated, but now also including skew quadrupole correction in order to suppress betatron coupling and spurious vertical dispersion. For this purpose, a maximum of 200 auxiliary coils15 are available on chromatic sextupoles (160) as well as octupoles without dispersion

Conclusions & outlook

Beam commissioning in the MAX IV 3 GeV storage ring has progressed quite far. Injection with a single dipole kicker has proved robust and allowed injection and accumulation of up to 200 mA at high capture efficiency. Orbit correction and symmetrization of the linear optics have been successfully carried out. Top-up injection and SOFB are operated routinely and have allowed ID and beamline commissioning to make progress up to the point where actual user data is being acquired at the first two

Acknowledgments

The authors are grateful for the extensive support received from the MAX IV operators during measurement campaigns. Jason Brudvik is acknowledged for his help with the Archiver. Jens Sundberg’s scraper measurement data and lifetime analysis are much appreciated. The authors would like to acknowledge Mikael Eriksson, Hamed Tarawneh, and Johan Bengtsson for many stimulating discussions as well as Les Dallin (CLS) for proofreading of the manuscript. The authors would also like to offer their

References (51)

  • TarawnehH. et al.

    Nucl. Instrum. Methods A

    (2003)
  • LeemannS.C.

    Nucl. Instrum. Methods A

    (2012)
  • OlssonD.

    Nucl. Instrum. Methods A

    (2014)
  • AnderssonJ.

    Nucl. Instrum. Methods A

    (2017)
  • WerinS.

    Nucl. Instrum. Methods A

    (2009)
  • SjöströmM.

    Nucl. Instrum. Methods A

    (2008)
  • M. Eriksson, The MAX4 accelerator system, unpublished internal note, 2002. Available at...
  • MAX IV detailed design report. Available at...
  • S.C. Leemann, First commissioning experience with the MAX IV 3 GeV storage ring, Presentation given at the 5th Low...
  • S.C. Leemann, Commissioning Progress at the MAX IV 3 GeV Storage Ring, Presentation given at the 6th Low Emittance...
  • LeemannS.C.

    Phys. Rev. ST Accel. Beams

    (2009)
  • LeemannS.C. et al.

    Phys. Rev. ST Accel. Beams

    (2011)
  • S.C. Leemann, THPC059, Proceedings of IPAC2011, San Sebastián, Spain, 2011. pp....
  • S.C. Leemann, MAX-lab internal note 20121107. Available at...
  • S.C. Leemann, The MAX IV 3 GeV storage ring lattice, in: Y. Cai (Ed.) Contribution to ICFA Beam Dynamics Newsletter...
  • TavaresP.F. et al.

    J. Synchrotron Radiat.

    (2014)
  • S.C. Leemann, Lattice design for the MAX IV storage Rings, in: J. Gao (Ed.) Contribution to ICFA Beam Dynamics...
  • LeemannS.C.

    Phys. Rev. ST Accel. Beams

    (2012)
  • M. Eriksson, et al., MOYAA01, Proceedings of IPAC2016, Busan, Korea, 2016. pp....
  • M. Johansson, MAX IV 3 GeV ring magnets, Presentation given at the 2nd Advanced Low Emittance Rings Technology (ALERT)...
  • L. Malmgren, MAX IV RF systems, Presentation given at the 2nd Advanced Low Emittance Rings Technology (ALERT) Workshop,...
  • E. Al-Dmour, MAX IV vacuum system, from design to operation, Presentation given at the XXIV European Synchrotron Light...
  • G. Skripka, et al., WEPOW035, Proceedings of IPAC2016, Busan, Korea, 2016. pp....
  • M. Sjöström, MAX IV subsystem commissioning, Presentation given at the 6th Low Emittance Rings Workshop, SOLEIL, Paris,...
  • E. Al-Dmour, M.J. Grabski, The vacuum system of MAX IV storage rings: Installation and conditioning, in: WEPVA090,...
  • Cited by (14)

    • Studies of transverse single-bunch instabilities in booster synchrotrons

      2019, Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
    • Pushing the MAX IV 3 GeV storage ring brightness and coherence towards the limit of its magnetic lattice

      2018, Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
    • Toward a diffraction limited light source

      2023, Physical Review Accelerators and Beams
    View all citing articles on Scopus
    View full text