Post-Bam earthquake: recovery and reconstruction

  • Original Paper
  • Published:
Natural Hazards Aims and scope Submit manuscript

Abstract

This paper gives a brief explanation of the earthquake in Bam. It also reports on the rescue and relief operations, including the construction of emergency shelters and temporary housing, and on the country’s plan for the reconstruction of the city, which includes debris removal, the rebuilding of rural and urban residential and commercial units, the reconstruction of state and public buildings and public facilities such as schools, rural and urban water aqueducts and grids, the construction of a sewage system, power network and telecommunication system, the provision of water to orchards and farmlands, the renovation of industries and the revival of the cultural heritage, particularly the historical Bam citadel, among others. We also report briefly on the effect of the Bam earthquake on the Iran Earthquake Risk Reduction Strategy and actions.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Fig. 9

Similar content being viewed by others

Notes

  1. Aqueducts.

References

  • Askari F et al (2004) Preliminary seismic microzonation of Bam. J Seismol Earthq Eng 5:69–80

    Google Scholar 

  • Eshghi S, Zare M (2004) IIEES reconnaissance report on 26 December 2003, Bam Earthquake. IIEES Publ, Tehran

  • Ghafory-Ashtiany M (1999) Rescue operation and reconstruction of recent earthquakes in Iran. Disaster Prevent Manage J 8:5–20

    Article  Google Scholar 

  • Ghafory-Ashtiany M (2004) Bam earthquake of 05:26:26 of 26 December 2003, Ms6.5. J Seismol Earthq Eng 5:1–3

    Google Scholar 

  • Ghafory-Ashtiany M (2006) Earthquake risk management strategies: the Iranian experience. UNESCO, Tehran Cluster Office, Tehran, Iran

  • Hosseini M (2007) Reconstruction of towns and cities after destructive earthquakes: challenges and possibilities form the urban design point of view. In: Proc 9th Can Conf Earthq Eng (in press)

  • Iran Statistics Center-ISC (2004) The results of the places and families listing of Bam earthquake regions. ISC, Tehran

  • Ministry of Housing and Urban Development. (2004) The preliminary report of Bam city. Deputy of the Engineering Statute and Building Executing, Tehran, Iran

  • The Acts collection of “Bam Reconstruction Headquarter” (2004). Tehran, Iran

  • The Collection of Work Progress Reports of the Islamic Revolution Housing Foundation (IHF) (2004–2006). Islamic Revolution Housing Foundation, Tehran, Iran

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Mohsen Ghafory-Ashtiany.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Ghafory-Ashtiany, M., Hosseini, M. Post-Bam earthquake: recovery and reconstruction. Nat Hazards 44, 229–241 (2008). https://doi.org/10.1007/s11069-007-9108-3

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11069-007-9108-3

Keywords

Navigation