Abstract
Collaborative product commerce (CPC) solutions span software and services which permit individuals to share product data to improve the design, development, and management of products throughout the product development lifecycle. Drawing upon prior developments in adaptive structuration theory (AST) and media richness theory, I develop a theoretical framework to better understand the role of CPC in enabling collaboration in a product development environment. I study the impact of CPC on product design and development processes using a cross-sectional survey of 36 firms. The study reveals that CPC usage varies across different phases of the product development lifecycle. Preliminary results indicate that CPC has enabled firms to collaborate effectively with external stakeholders, which has resulted in tangible business benefits. I conclude by developing several research propositions which provide a roadmap for conducting future empirical research to measure the impact of CPC on product development, and highlight potential research topics that can be explored.
Similar content being viewed by others
Notes
The act of bringing rules and resources from an advanced technology or other structural source into action is called structuration [10].
I refer readers to Fig. 2 in Vickery et al. [40], which explains the relationship between information richness and the complexity of task characteristics (measured as uncertainty, difficulty, variability, and interdependence) in retail/consumer and business-to-business (B2B) industrial services.
This step was necessary to ensure that there was no ambiguity in the definition of CPC and that companies had a clear understanding of the types of software that comprised CPC.
In fact, these business processes may straddle multiple phases of the product lifecycle.
The wide range of cost savings is explained by the size of the company and scope of CPC implementation.
I have compressed the layout and language of the actual questionnaire to meet the page limitations of a journal paper.
In reality, the survey questionnaire provided one page per process for respondents to provide their completed responses to the questions pertaining to each process.
References
P.S. Adler, Interdepartmental interdependence and coordination: the case of the design/manufacturing interface, Organization Science 6(2) (1995) 147–167
Y. Baba and K. Nobeoka, Toward knowledge-based product development: the 3-D CAD model of knowledge creation, Research Policy 26 (1998) 643–659
A. Bajaj, S. Kekre and K. Srinivasan, Managing NPD: cost and schedule performance in design and manufacturing, Management Science 50(4) (2004) 527–536
R.D. Banker, I.R. Bardhan and O. Asdemir, Understanding the impact of collaboration software on product design and development, Information Systems Research 17(4) (2006) 352–373
M. Carroll, Collaborative commerce: the next big thing in global manufacturing, eAI Journal (July 2001) 20–24
T. Carte and L. Chidambaram, A capabilities-based theory of technology deployment in diverse teams: leapfrogging the pitfalls of diversity and leveraging its potential with collaborative technology, Journal of the Association for Information Systems 5(11–12) (2004) 448–471
R.L. Daft and R.H. Lengel, Organizational information requirements, media richness, and structural design, Management Science 32(5) (1986) 554–571
P. Davamanirajan, R.J. Kauffman, C. Kriebel and T. Mukhopadhyay, Systems design, process performance and economic outcomes: an empirical study of letter of credit systems integration in international banking, Journal of Management Information Systems, 23(2) (2006) 65–90
J. Davis, E. Subramanian, S. Konda, H. Granger, M. Collins and A. Westerberg, Creating shared information spaces to support collaborative design work, Information Systems Frontiers 3(3) (2001) 377–392
G. DeSanctis and M.S. Poole, Capturing the complexity in advanced technology use: adaptive structuration theory, Organization Science 5(2) (1994) 121–147
K.M. Eisenhardt and B. Tabrizi, Accelerating adaptive processes: product innovation in the global computer industry, Administrative Science Quarterly 40 (1995) 84–110
A. Giddens, Central Problems in Social Theory (University of California Press, Berkeley, CA, 1979)
M. Hansen and N. Nohria, How to build collaborative advantage. MIT Sloan Management Review (Fall 2004) 22–30.
D.E. Harter, M.S. Krishnan and S. Slaughter, Effects of process maturity on quality, cycle time, and effort in software product development, Management Science 46(4) (2000) 451–466
P. Hinds and S. Kiesler, Communication across boundaries: work, structure, and use of communication technologies in a large organization, Organization Science 6(4) (1995) 373–393
P. Hinds, D.E. Bailey, Out of sight, out of sync: understanding conflict in distributed teams, Organization Science 14(6) (2003) 615–632
M.M. Hoegl and H.G. Gemuenden, Teamwork quality and the success of innovative projects: a theoretical concept and empirical evidence, Organization Science 12(4) (2001) 435–449
M.M. Hoegl, K. Weinkauf and H.G. Gemuenden, Inter-team coordination, project commitment, and teamwork in multi-team R&D projects: a longitudinal study, Organization Science 15(1) (2004) 38–55
R. Holman, H-W. Kaas and D. Keeling, The future of product development, The McKinsey Quarterly 3 (2003) 28–39
R.E. Kraut, R. Fussel, S.E. Brennan, and J. Seigel, Understanding effects of proximity on collaboration: implications for technology to support remote collaborative work, in P.J. Hinds and S. Kiesler (eds), Distributed Work (MIT Press, Cambridge, MA, 2002), pp. 137–162
V. Krishnan and K. Ulrich, Product development decisions: a review of the literature, Management Science 47(1) (2001) 1–21
J.K. Liker, M. Fleischer and D. Arnsdorf, Fulfilling the promise of CAD, Sloan Management Review (Fall 1992) 74–86
K. O’Marah, Make to desire: how new technologies are revolutionizing lifecycle management, in N. Mulani (eds), Achieving Supply Chain Excellence through Technology 4 (Montgomery Research, San Francisco CA, 2001), pp. 106–109
T. Malone and K. Crowston, The inter-disciplinary study of coordination, ACM Computer Surveys 26(1) (1994) 87–119
M.L. Maznevski and K.M. Chudoba, Bridging space over time: global virtual team dynamics and effectiveness, Organization Science 11(5) (2000) 473–492
A. McAfee, Will web services really transform collaboration, MIT Sloan Management Review (Winter 2005) 78–84
M. McGrath and M. Iansiti, Envisioning IT-enabled innovation, Insight Magazine (1998) 2–10
N. Mulani and J. Matchette, Lifecycle collaboration: linking strategy and execution to sustain superior performance, in Achieving Supply Chain Excellence through Technology, Vol. 4 (Montgomery Research, San Francisco, CA, 2001), pp. 206–208
S. Nambisan, Information systems as a reference discipline for new product development, MIS Quarterly 27(1) (2003) 1–18
I. Nonaka, Dynamic theory of organizational knowledge creation, Organization Science 5(1) (1994) 14–37
M. Ozer, Information technology and new product development: opportunities and pitfalls, Industrial Marketing Management 29 (2000) 387–396
O. Port, Design tools move into the fast lane: new software turns ideas into reality in record time, Business Week 2 (2003) 84
H. Salzman, Computer-aided design: limitations in automating design and drafting, IEEE Transactions on Engineering Management 36(4) (1989) 252–261
P.G. Smith and D.G. Reinertsen, Developing Products in Half the Time: New Rules, New Tools (John Wiley and Sons, New York, NY, 1998)
M.E. Sosa, S. Eppinger, M. Pich, D. McKendrick and S. Stout, Factors that influence technical communication in distributed product development: an empirical study in the telecommunications industry, IEEE Transactions on Engineering Management 49(1) (2002) 45–58
T. Terwiesch, C. Loch and A. De Meyer, Exchanging preliminary information in concurrent engineering, Organization Science 13(4) (2002) 402–419
S. Thomke and D.G. Reinertsen, Agile product development: managing development flexibility in uncertain environments, California Management Review 41(1) (1998) 8–30
K.T. Ulrich and S.D. Eppinger, Product Design and Development, 2nd ed. (Irwin McGraw-Hill, New York NY, 2000)
E. Von Hippel, Economics of product development by users: the impact of ‘sticky’ local information, Management Science 44(5) (1998) 629–644
S. Vickery, C. Droge, T.P. Stank, T.J. Goldsby and R.E. Markland, The performance implications of media richness in a business-to-business service environment: direct versus indirect effects. Management Science 50(8) (2004) 1106–1119
B. Welty and I. Becerra-Fernandez, Managing trust and commitment in collaborative supply chain relationships, Communications of the ACM 44(6) (2001) 67–73
A. Yassine, K.C. Kim, T. Roemer and M. Holweg, Investigating the role of IT in customized product design. Production Planning and Control 15(4) (2004) 422–434
Acknowledgements
Helpful comments by the associate editor and both referees are gratefully acknowledged. I gratefully acknowledge the reviewers and participants of the Ninth INFORMS Conference on Information Systems and Technology held in October 2004 in Denver, Colorado.
Author information
Authors and Affiliations
Corresponding author
Appendix: Survey Questionnaire
Appendix: Survey Questionnaire
Collaborative Product Commerce (CPC) is a class of collaboration software and tools that use internet technologies to permit individuals to collaboratively share intellectual data for the design, development, and management of product data throughout the product design and development lifecycle. CPC includes workflow tools that enable real-time exchange of product design data using structured business processes.
SECTION A: CONTEXTUAL QUESTIONS
-
1.
What is your job title?
-
2.
With respect to your knowledge of CPC as used by your company on a day-to-day basis, would you say that you are very knowledgeable, somewhat knowledgeable, or not at all knowledgeable?
(CONTINUE ONLY IF VERY KNOWLEDGEABLE)
-
3.
With respect to your knowledge about the products and processes your company used for product design and development, prior to installing CPC, would you say that you are very knowledgeable, somewhat knowledgeable, or not at all knowledgeable.
(CONTINUE ONLY IF VERY KNOWLEDGEABLE)
-
4.
How long has it been since your company went live using the CPC solution?
Years
Months
(TERMINATE IF LESS THAN 6 MONTHS)
-
5.
Why did your company purchase the CPC solution?
-
6.
Did your company use any product data management software prior to the purchase of the CPC solution? What was it?
-
7.
How does your company train employees in the use of the CPC solution?
-
a.
To date, how many employees have been trained?
-
b.
What is the average time it takes to train an employee in the use of CPC?
-
a.
-
8.
Could you refer me to a person in your company that would be able to answer high-level business questions around product development such as how your company tracks the size of a product development project, and business goals to collaborate internally and externally?
SECTION B
-
1.
To the best of your knowledge what is your company’s annual sales revenue?
Annual Revenue
Place an ‘X’ next to the appropriate row
a.
Less than $1 million
b.
$1 million to $10 million
c.
$10 million to $24.9 million
d.
$25 million to $49.9 million
e.
$50 million to $99.9 million
f.
$100 million to $249 million
g.
$250 million to $500 million
h.
$501 million to $1 billion
i.
$1.1 billion to $10 billion
j.
$10.1 billion to $25 billion
k.
$25.1 billion to $50 billion
l.
Greater than $50 billion
-
2.
What is the total annual product development budget of your company?
Product Development Budget
Place an ‘X’ next to the appropriate row
a.
Less than $1 million
b.
$1 million to $10 million
c.
$10 million to $24.9 million
d.
$25 million to $49.9 million
e.
$50 million to $99.9 million
f.
$100 million to $249 million
g.
$250 million to $500 million
h.
$501 million to $1 billion
i.
$1.1 billion to $5 billion
j.
Greater than 5 billion
-
3.
What is the primary business your company is in?
Industry
Place an ‘X’ next to the appropriate row
a.
Automotive manufacturing
b.
Hi-tech manufacturing (computers, storage, semiconductors, telecom, electronics)
c.
Aerospace and Defense
d.
Consumer Products (non electronics)
e.
Machinery, Industrial Equipment
f.
Pharmaceuticals & Medical Equipment
g.
Chemicals
h.
Oil & Gas, Energy
i.
Construction
j.
Other (please specify)
SECTION C
-
1.
What does your company use CPC software for? Check (X) all that apply.
[by external collaboration we mean with partners, customers, or suppliers]
a. Product Data Management
b. Product Design Management
c. New Product Introduction
d. Engineering Change Order Evaluation
e. Engineering Change Implementation
f. Product Re-work (due to product errors)
g. Design Re-use
h. Inventory Management
i. Internal Collaboration
j. External Collaboration
k. Other (Please Specify)
-
2.
In which of the following six phases of product design and development does CPC software play a role in? Check (x) all that apply.
Functional Process
a.
Product Concept and Initiation
b.
Product Development Proposal
c.
Research and Development
d.
Product Development and Manufacturing Design
e.
Product Design Verification and Manufacturing Development
f.
Pilot Production and Product Introduction
-
3.
External Collaboration
Please respond to the following statements based on your observations from a typical product design and development project after CPC has been implemented and used for a period of at least six months.
Question
Yes/No
SUPPLIERS
Has your company been able to open up the design phase to suppliers?
Are you working earlier in the design collaboration cycle with suppliers?
What was the overall % reduction in percentage of development time based on working with suppliers?
%
What percentage of your total product development are your suppliers responsible for?
%
CUSTOMERS
Has your company been able to open up the design phase to customers?
Are you working earlier in the design collaboration cycle with customers?
What was the overall reduction in percentage of development time based on working with customers?
%
What percentage of your total product development are your customers responsible for?
%
PARTNERS
Has your company been able to open up the design phase to partners?
Are you working earlier in the design collaboration cycle with partners?
What was the overall reduction in percentage of development time based on working with partners?
%
What percentage of your total product development are your partners responsible for?
%
-
4.
BENEFITS TO BUSINESS GROWTH Which of the following business benefits has e-Matrix collaboration software produced for your company? [SELECT ALL THAT APPLY]
Business Benefit
Yes or No
Dollar value of reported benefits
Faster Time to Market
First to Market
More Innovation
Product Quality
Process Improvements
Earlier Supplier Involvement in Design Cycle
Collaborating with Suppliers
Collaborating with Customers
Collaboration Internally
Collaboration with Partners
Facilitation of cross enterprise concurrent engineering
Leverage existing internal resources to greater efficiency
Employee performance/productivity
Customer satisfaction
SECTION D
-
1.
For each of the following \({\underline{\hbox{functional}}}\) processes, please provide your responses to the following questions. Footnote 8
-
Product Concept and Initiation
-
Product Development Proposal
-
Research & Development
-
Product Development & Manufacturing Design
-
Product Design Verification & Manufacturing Development
-
Pilot Production & Product Introduction
-
For each question, please provide sufficient details regarding the impact of CPC, what specific actions were taken, what activities were affected, the magnitude of the impact, and the key process benefits.
-
a.
How has CPC changed the way your company manages this business process?
-
b.
Thinking about the way CPC has changed how your company manages this process, could you estimate the cost savings associated with that?
-
c.
Have you been able to reduce staff or staff time on this issue?
-
d.
Have you been able to save money from process or procedural tasks?
-
2.
For each of the following \({\underline{\hbox{business}}}\) processes, please provide your responses to the following questions. Footnote 9
-
Product Data Management
-
Product Design Management
-
Product Development Cycle Management
-
New product Introduction
-
Engineering Change Order Evaluation
-
Engineering Change Order Implementation
-
Product Reworks
-
Design Reuse
-
Inventory Management
-
Internal Collaboration
-
External Collaboration
-
For each question, please provide sufficient details regarding the impact of CPC, what specific actions were taken, what activities were affected, the magnitude of the impact, and the key process benefits.
-
a.
How has CPC changed the way your company manages this business process?
-
b.
Thinking about the way CPC has changed how your company manages this process, could you estimate the cost savings associated with that?
-
c.
Have you been able to reduce staff or staff time on this issue?
-
d.
Have you been able to save money from process or procedural tasks?
Rights and permissions
About this article
Cite this article
Bardhan, I.R. Toward a theory to study the use of collaborative product commerce for product development. Inf Technol Manage 8, 167–184 (2007). https://doi.org/10.1007/s10799-007-0013-y
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10799-007-0013-y