Abstract
Let $G=(V,E)$ be an undirected multigraph with a special vertex ${\it root} \in V$, and where each edge $e \in E$ is endowed with a length $l(e) \geq 0$ and a capacity $c(e) > 0$. For a path $P$ that connects $u$ and $v$, the {\it transmission time} of $P$ is defined as $t(P)=\mbox{\large$\Sigma$}_{e \in P} l(e) + \max_{e \in P}\!{(1 / c(e))}$. For a spanning tree $T$, let $P_{u,v}^T$ be the unique $u$--$v$ path in $T$. The {\sc quickest radius spanning tree problem} is to find a spanning tree $T$ of $G$ such that $\max _{v \in V} t(P^T_{root,v})$ is minimized. In this paper we present a 2-approximation algorithm for this problem, and show that unless $P =NP$, there is no approximation algorithm with a performance guarantee of $2 - \epsilon$ for any $\epsilon >0$. The {\sc quickest diameter spanning tree problem} is to find a spanning tree $T$ of $G$ such that $\max_{u,v \in V} t(P^T_{u,v})$ is minimized. We present a ${3 \over 2}$-approximation to this problem, and prove that unless $P=NP$ there is no approximation algorithm with a performance guarantee of ${3 \over 2}-\epsilon$ for any $\epsilon >0$.
Similar content being viewed by others
Author information
Authors and Affiliations
Corresponding authors
Rights and permissions
About this article
Cite this article
Hassin, R., Levin, A. Approximation Algorithms for Quickest Spanning Tree Problems. Algorithmica 41, 43–52 (2005). https://doi.org/10.1007/s00453-004-1118-x
Received:
Revised:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00453-004-1118-x