Scheduling automated triple cross-over stacking cranes in a container yard

  • Regular Article
  • Published:
OR Spectrum Aims and scope Submit manuscript

Abstract

We describe an approach for scheduling triple cross-over stacking cranes in an automated container storage block with asynchronous hand over at the transfer areas at both block front ends. The problem is characterised by frequent long crane moves that make job assignment and crane routing particularly challenging, as an intricate synchronisation between the cranes is required. The main objective is to maximise the productivity of the crane system under peak load while preventing delays in the transport of import and export containers from and to the transfer areas. Our method solves an online optimisation problem by constructing a new crane schedule for a certain planning horizon whenever a new job arrives or a job is completed. We report on extensive simulation studies for evaluating the scheduling strategy. The results show that the method performs significantly better than commonly used heuristics, leading to a productivity gain of more than 20%.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Bohrer P (2005) Crane scheduling in container terminals. Diploma thesis, Department of Mathematics, University of Kaiserslautern

  • Choe R, Park T, Min Ok S, Ryel Ryu K (2007) Real-time scheduling for non-crossing stacking cranes in an automated container terminal. In: AI 2007: advances in artificial intelligence, lecture notes in computer science. Springer, Berlin/Heidelberg, pp 625–631

  • Daganzo CF (1989) The crane scheduling problem. Transp Res 23B(3): 159–175

    Article  Google Scholar 

  • Froyland G, Koch T, Megow N, Duane E, Wren H (2008) Optimizing the landside operation of a container terminal. OR Spectr 30(1): 53–75

    Article  Google Scholar 

  • Kim KH, Kim KY (1999) An optimal routing algorithm for a transfer crane in port container terminals. Transp Sci 33(1): 17–33

    Article  Google Scholar 

  • Koch T (2004) Rapid mathematical programming. PhD thesis, TU Berlin. Available as ZIB-Report 04-58

  • Narasimhan A, Palekar US (2002) Analysis and algorithms for the transtainer routing problem in container port operations. Transp Sci 36(1): 63–78

    Article  Google Scholar 

  • Ng WC (2005) Crane scheduling in container yards with inter-crane interference. Eur J Oper Res 164(1): 64–78

    Article  Google Scholar 

  • Ng WC, Mak KL (2005) Yard crane scheduling in port container terminals. Appl Math Model 29(3): 263–276

    Article  Google Scholar 

  • Saanen Y (2004) An approach for designing robotized marine container terminals. PhD thesis, Delft University of Technology

  • Saanen Y, van Valkengoed M (2006) Comparison of three automated stacking alternatives by means of simulation. In: Proceedings of the winter simulation conference 2005, pp 1567–1576

  • Saanen Y, Rijsenbrij J (2007) Which system fits your hub? In: Cargo Systems, June 2007, pp 47–51

  • Stahlbock R, Voß S (2008) Operations research at container terminals: a literature update. OR Spectr 30(1): 1–52

    Article  Google Scholar 

  • Stahlbock R, Voß S, Eisenberg R (2008) Increasing the efficiency of container terminals by automated double rail mounted gantry cranes. In: Presented at the 3rd German–Korean workshop on container terminal management: IT-based planning and control of seaport container terminals and transportation systems, August 27–31, Bremen, Germany

  • van Valkengoed M (2004) How passing cranes influence stack operations in a container terminal: a simulation study. TBA Nederland, Delft, and Master’s thesis, University of Amsterdam

  • Zyngiridis I (2005) Optimizing container movements using one and two automated stacking cranes. Master’s thesis, Naval Postgraduate School, Monterey

Download references

Author information

Authors and Affiliations

Authors

Corresponding authors

Correspondence to Ulrich Dorndorf or Frank Schneider.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Dorndorf, U., Schneider, F. Scheduling automated triple cross-over stacking cranes in a container yard. OR Spectrum 32, 617–632 (2010). https://doi.org/10.1007/s00291-010-0206-3

Download citation

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00291-010-0206-3

Keywords

Navigation