Abstract
In order to accompany the increasing variety of costumers’ demands, manufacturers tend to produce different models of the same product on an assembly line by introducing group assembly (GA) design concepts that improve the flexibility of assembly systems. Generally, when the demand for a set of similar products is relatively low and the set-up time is significant, the beneficial effects of the task repeatability of the straight line configuration are difficult to achieve. As a consequence, the fixed-point assembly philosophy is often preferred. This paper addresses the application of a mixed-model assembly balancing problem to an assembly-to-order environment in the case of low production rates and large number of tasks. The aim of this work is to propose an alternative design procedure for the balancing of semi-automated and mixed-model assembly systems under low product demand effects by the application of multi-turn circular transfers, such as a multi-stations rotating table. This layout configuration permits a job enlargement for human operators and, at the same time, provides an increment in task repeatability through the work-pieces assembling by increasing the number of the turns of the transfer. Finally, the developed heuristic procedure is tested on a simple rotating table assembly cell, a partial representation of a complete assembly system of domestic air compressors.
Similar content being viewed by others
References
Wang HP, Li JK (1991) Computer-aided process planning. Elsevier, North Holland, pp 291–296
Bukchin J et al (2002) Mixed model assembly line design in a make-to-order environment. Comput Ind Eng 41:405–421
Gupta P, Somers T (1992) The measurement of manufacturing flexibility. Eur J Oper Res 60(3):160–182
Lederer PJ, Singhal VR (1988) Effect of cost structure and demand risk in the justification of new technologies. J Manuf Oper Manage 1(4):339–371
Jordan W, Graves C (1995) Principles on the benefits of manufacturing process flexibility. Manage Sci 41(4):577–594
Beker C, Scholl A (2005) A survey on problems and methods in generalized assembly line balancing. Eur J Oper Res 168:694–715
Aase GR et al (2004) U-shaped assembly line layouts and their impact on labor productivity: an experimental study. Eur J Oper Res 156:698–711
Engstrom T et al (1996) Alternatives to line assembly: some Swedish examples. Ind Ergon 17:235–245
Heike G et al (2001) Mixed model assembly alternatives for low-volume manufacturing: the case of the aerospace industry. Int J Prod Econ 72:103–120
McMullen PR (1998) JIT sequencing for mixed-model assembly lines with setups using Tabu Search. Prod Plan Control 9(5):504–510
Cohen Y, Dar-el E (1998) Optimizing the number of stations in assembly lines under learning for limited production. Prod Plan Control 9(3):230–240
Abdullah TA, Popplewell K, Page CJ (2003) A review of the support tools for the process of assembly method selection and assembly planning. Int J Prod Res 41(11):2391–2410
Bard JF (1989) Assembly line balancing with parallel workstations and dead time. Int J Prod Res 27:1005–1018
Buzacott JA (1990) Abandoning the moving assembly line: models of human operators and job sequencing. Int J Prod Res 28(5):821–839
Bartholdi JJ (1993) Balancing two-sided assembly lines: a case study. Int J Prod Res 31:2447–2461
Inman RR, Leon M (1994) Scheduling duplicate serial stations in transfer lines. Int J Prod Res 32(11):2631–2644
Kadefors R et al (1996) Ergonomics in parallelized car assembly: a case study, with reference also to productivity aspects. Appl Ergon 27(2):101–110
Van Zante-de Fokkert JI, De Kok TG (1997) The mixed and multi model line balancing problem: a comparison. Eur J Oper Res 100:399–412
McMullen PR (1997) A heuristic for solving mixed-model line balancing problem with stochastic task durations and parallel stations. Int J Prod Econ 51(1):77–190
Askin RG, Zhou M (1997) A parallel station heuristic for the mixed-model production line balancing problem. Int J Prod Res 35(11):3095–3105
Gokçen H, Erel E (1997) A goal programming approach to mixed model assembly line balancing problem. Int J Prod Economics 48:177–185
Suer GA (1998) Designing parallel assembly lines. Comput Ind Eng 35(3–4):467–470
Urban TL (1998) Note: optimal balancing of U-shaped assembly line. Manage Sci 44:738–774
Sarker BR, Pan H (1998) Designing a mixed-model assembly line to minimize the cost of idle and utility times. Comput Ind Eng 34(3):609–628
Scholl A, Klein R (1999) ULINO: optimally balancing U-shaped JIT assembly lines. Int J Prod Res 37(4):721–736
Kim YK, Kim K, Lee TO (1999) Two-sided assembly line balancing models. Technical report. Chonnam National University, Kwangju
Erel E, Gokcen H (1999) Shortest route formulation of mixed model assembly line balancing problem. Eur J Oper Res 116:194–204
Kim YK, Kim Y, Kim JY (2000)Two-sided assembly line balancing: a genetic algorithm approach. Prod Plan Control 11:44–53
Miltenburg J (2001) U-shaped production lines: A review of theory and practice. Int J Prod Econ 70:201–214
Lee TO et al (2001) Two-sided assembly line balancing to maximize work relatedness and slackness. Comput Ind Eng 40:273–292
Rekiek B et al (2001) A multiple objective grouping, genetic algorithm for assembly line design. J Intell Manuf 12:467–485
Sarker BR, Pan H (2001) Design a mixed-model, open-station assembly line using mixed-integer programming. J Oper Res Soc 52:545–558
Sarker BR, Pan H (2001) Design configuration for a closed-station, mixed-model assembly line: a filing cabinet manufacturing system. Int J Prod Res 39(10):2251–2270
Vilarinho PM, Simaria AS (2002) A two stage heuristic method for balancing mixed model assembly lines with parallel workstations. Int J Prod Res 40(6):1405–1420
Kurashige K et al (2002) Time-based goal chasing method for mixed-model assembly line problem with multiple work stations. Prod Plan Control 13(8):735–745
Jin M, Wu SD (2002) A new heuristic method for mixed model assembly line balancing problem. Comput Ind Eng 44:159–169
Munoz LF, Villalobos JR (2002) Work allocation strategies for serial assembly lines under high labor turnover. Int J Prod Res 40(8):1835–1852
Karabat S, Sayin S (2003) Assembly line balancing in a mixed-model sequencing environment with synchronous transfers. Eur J Oper Res 149:417–429
Van Hop N (2004) A heuristic solution for fuzzy mixed-model line balancing problem. Eur J Oper Res 168(3):798–810
Gokçen H, Agpak K (2004) A goal programming approach to simple U-line balancing problem. Eur J Oper Res 171(2):577–585
Urban TL, Chiang WC (2004) An optimal piecewise-linear optimization of the U-line balancing problem with stochastic task time. Eur J Oper Res 168(3):771–782
Kim YK et al (2004) An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed model U-lines. Eur J Oper Res 168(3):838–852
Simaria AS, Vilarinho PM (2004) A genetic algorithm based approach to the mixed model assembly line balancing problem of type II. Comput Ind Eng 47:391–407
Bukchin Y, Rabinowitch I (in press) A branch-and-bound based solution approach for the mixed model assembly line balancing problem for minimizing stations and tasks duplication costs. Eur J Oper Res
Scholl A (1995) Balancing and sequencing of assembly lines. Physica, Munich
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Battini, D., Faccio, M., Ferrari, E. et al. Design configuration for a mixed-model assembly system in case of low product demand. Int J Adv Manuf Technol 34, 188–200 (2007). https://doi.org/10.1007/s00170-006-0576-5
Received:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s00170-006-0576-5