Skip to main content
Log in

An integrated scheme for process planning and scheduling in FMS

  • Original Article
  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

Process planning and scheduling are the two important manufacturing functions involved in any shop floor activities. As functional integration is essential to realize the benefits of computer integrated manufacturing, a scheme for integration of process planning and scheduling has been introduced in this paper. The proposed scheme can be implemented in a company with existing process planning and scheduling departments when multiple process plans remain available on the shop floor. It consists of two main modules, introduced in detail in this paper. They are process plan selection module and scheduling module.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Larsen NE, Alting L (1992) Dynamic planning enriches concurrent process and production planning. Int J Prod Res 30(8):1861–1876

    Google Scholar 

  2. Khoshnevis B, Chen Q (1990) Integration of process planning and scheduling functions. J Intell Manuf 1:165–176

    Article  Google Scholar 

  3. Carton BA, Ray ST (1991) ALPS-a language for process specification. Int J Comput Integr Manuf 4:105–113

    Google Scholar 

  4. Chryssolouris G, Dick K, Lee M (1991) Short interval scheduling for discrete parts manufacturing. Int J Comput Integr Manuf 4:157–168

    Google Scholar 

  5. Tonshoff HK, Beckendorff U, Andres N (1989) FLEXPLAN: A concept for intelligent process planning and scheduling. CIRP International Workshop, Hannover, Germany, September, pp. 21–22

    Google Scholar 

  6. Benjaafar S, Ramakrishnan R (1996) Modeling, measurement and evaluation of sequencing flexibility in manufacturing systems. Int J Prod Res 4(5):1195–1220

    Google Scholar 

  7. Kempenaers J, Pinte J, Detand J, Kruth JP (1996) A collaborative process planning and scheduling system. Adv Eng Softw 25:3–8

    Article  Google Scholar 

  8. Kim KH, Egbelu PJ (1999) Scheduling in a production environment with multiple process plans per job. Int J Prod Res 37(12):2725–2753

    Article  MATH  Google Scholar 

  9. Iwata K, Fukuda Y (1989) A new proposal of dynamic process planning in machine shop. Proc CIRP International workshop on Computer aided process planning, Hanover university, Germany, 21–22 Sept 1989

    Google Scholar 

  10. Chen Q, Khoshnevis B (1992) Scheduling with flexible process plans. Prod Plan Control 3:1–11

    MATH  Google Scholar 

  11. Joo J, Park S, Cho H (2001) Adaptive and dynamic process planning using neural networks. Int J Prod Res 39(13):2923–2946

    Article  MATH  Google Scholar 

  12. Huang SS, Zhang HC, Smith ML (1995) A progressive approach for the integration of process planning and scheduling. IIE Trans 27:456–464

    Google Scholar 

  13. Zhang HC, Mullar S (1994) An integrated model of process planning and production scheduling. Int J Comput Integr Manuf 7:356–364

    Google Scholar 

  14. Zhang HC, Merchant ME (1993) IPPM – A prototype to integrate process planning and job shop scheduling functions. Ann CIRP 42(1):513–518

    Article  Google Scholar 

  15. Mamalis AG, Malagardis I, Kambouris K (1996) On-line integration of a process planning module with production scheduling. Int J Adv Manufacturing Technol 12:330–338

    Article  Google Scholar 

  16. Balasubramanian S, Noorie DH (1996) A multi-agent architecture for concurrent design, process planning, routing and scheduling. Concurr Eng: Res Appl 4(1):7–16

    Google Scholar 

  17. Larsen NE, Alting L (1990) Simulations engineering within process and production planning. 1990 Pacific Conference on Manufacturing, Australia, 17–21 December 1990

    Google Scholar 

  18. Chryssolouris G, Chen S (1985) An integrated approach to process planning and scheduling. Ann CIRP 34(1):413–417

    Google Scholar 

  19. Zijm WHM, Kals HJJ (1995) The integration of process planning and shop floor scheduling in small batch part manufacturing. Ann CIRP 44(1):429–432

    Google Scholar 

  20. Yang YN, Parsaei HR, Leep HR (2001) A prototype of a feature –based multiple-alternative process planning system with scheduling verification. Comput Ind Eng 39:109–124

    Article  Google Scholar 

  21. Seo Y (1993) Integrated manufacturing systems design through process plan and AGV guide path selection. Dissertation, Department of Industrial and Management Systems Engineering, The Pennsylvania State University

  22. Yang Z, Qiao L, Jiang L (1998) Improving the performances of part dispatching based on multiple process plans using graph theory. Int J Prod Res 36(7):1987–2003

    Article  MATH  Google Scholar 

  23. Saygin C, Kilic SE (1999) Integrating flexible process plans with scheduling in flexible manufacturing system. Int J Adv Manuf Technol 15:269–280

    Article  Google Scholar 

  24. Jain A (2003) Integration of process planning & scheduling, Dissertation, Kurukshetra University, Kurukshetra, India

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to P. K. Jain.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Jain, A., Jain, P.K. & Singh, I.P. An integrated scheme for process planning and scheduling in FMS. Int J Adv Manuf Technol 30, 1111–1118 (2006). https://doi.org/10.1007/s00170-005-0142-6

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00170-005-0142-6

Keywords

Navigation