Skip to main content

Setting safety stocks in multi-stage inventory systems under rolling horizon mathematical programming models

  • Chapter
  • First Online:
Supply Chain Planning

Abstract

This paper considers the problem of determining safety stocks in multi-item multi-stage inventory systems that face demand uncertainties. Safety stocks are necessary to make the supply chain, which is driven by forecasts of customer orders, responsive to (demand) uncertainties and to achieve predefined target service levels. Although there exists a large body of literature on determining safety stock levels, this literature does not provide an effective methodology that can address complex multi-constrained supply chains. In this paper, the problem of determining safety stocks is addressed by a simulation based approach, where the simulation studies are based on solving the supply chain planning problem (formulated as a mathematical programming model) in a rolling horizon setting. To demonstrate the utility of the proposed approach, an application of the approach at Organon, a worldwide operating biopharmaceutical company, will be discussed.

Originally published in:

OR Spectrum (2009) 31:121–140

DOI 10.1007/s00291-007-0086-3

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 169.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  • Billington PJ, McClain JO, Thomas LJ (1983) Mathematical programming approaches to capacity-constrained MRP systems: review, formulation and problem reduction. Manage Sci 29:1126–1141

    Article  Google Scholar 

  • Callarman TE, Mabert VA (1978) Using material requirements planning with demand uncertainty. In: Proceedings of the 9th annual midwest AIDS conference. pp 151-155

    Google Scholar 

  • Callarman TE, Hamrin RS (1984) A comparison of dynamic lot sizing rules for use in a single stage MRP system with demand uncertainty. Int J Oper Prod Manage 4(2):39–49

    Article  Google Scholar 

  • Clark AJ, and Scarf H (1960) Optimal policies for a multi-echelon inventory problem. Manage Sci 6: 475–490

    Article  Google Scholar 

  • De Bodt MA, Van Wassenhove LN (1983) Lot sizes and safety stocks in MRP: a case study. Prod Inventory Manage 24(1):1–16

    Google Scholar 

  • De Kok AG, Fransoo JC (2003) Planning supply chain operations: definition and comparison of planning concepts. In: De Kok AG, Graves SC (eds) Design and analysis of supply chains: design, coordination and operation (Handbooks in Operations Research and Management Science, Volume 11). North Holland, Amsterdam, pp 597–675

    Google Scholar 

  • Diks EB, De Kok AG, Lagodimos AG (1996) Multi-echelon systems: a service measure perspective. Euro J Oper Res 95:241–263

    Article  Google Scholar 

  • Eilon S, Elmaleh J (1968) An evaluation of alternative inventory control policies. Int J Prod Res 7(1):3–14

    Article  Google Scholar 

  • Graves SC, Willems SP (2000) Optimizing strategic safety stock placement in supply chains. Manu Serv Oper Manage 2(1):68–83

    Article  Google Scholar 

  • Heath DC, Jackson PL (1994) Modeling the evolution of demand forecasts with application to safety stock analysis in production/distribution systems. IIE Trans 26(3):17–30

    Article  Google Scholar 

  • Inderfurth K (1991) Safety stock optimization in multi-stage inventory systems. Int J Prod Econ 24:103–113

    Article  Google Scholar 

  • Inderfurth K, Minner S (1998) Safety stocks in multi-stage inventory systems under different service measures. Eur J Oper Res 106:57–73

    Article  Google Scholar 

  • Kleijnen JPC, Wan J (2006) Optimization of simulated inventory systems: OpQuest and alternatives. Tilburg University: CentER Discussion Paper, no. 2006-75

    Google Scholar 

  • Kohler-Gudum CK, De Kok AG (2002) A safety stock adjustment procedure to enable target service levels in simulation of generic inventory systems. Technische Universiteit Eindhoven: BETA Working Paper 71

    Google Scholar 

  • Law AM, Kelton WD (2000) Simulation modelling and analysis, 3rd edn. McGraw-Hill, New York

    Google Scholar 

  • Minner S (1997) Dynamic programming algorithms for multi-stage safety stock optimization. OR Spektrum 19:261–271

    Article  Google Scholar 

  • Silver EA, Pyke DF, Peterson R (1998) Inventory management and production scheduling. Wiley, New York

    Google Scholar 

  • Spitter JM, Hurkens CAJ, De Kok AG, Negenman EG, Lenstra JK (2005) Linear programming models with planned lead times. Eur J Oper Res 163:706–720

    Article  Google Scholar 

  • Stadtler H (2003) Multi-level lot sizing with setup times and multiple constrained resources: internally rolling schedules with lot-sizing windows. Oper Res 51(3):487–502

    Article  Google Scholar 

  • Stadtler H, Kilger C (2005) Supply chain management and advanced planning, 3rd edn. Springer, Berlin Tempelmeier H, Derstroff M (1996) A Lagrangean-based heuristic for dynamic multi-level multi-item constrained lotsizing with setup times. Manage Sci 42(5):738–757

    Google Scholar 

  • Van Houtum GJ, Inderfurth K, Zijm WHJ (1996) Materials coordination in stochastic multi-echelon system. Eur J Oper Res 95:1–23

    Article  Google Scholar 

  • Wemmerlöv U, Whybark DC (1984) Lot-sizing under uncertainty in a rolling schedule environment. Int J Prod Res 22(3):467–484

    Article  Google Scholar 

  • Whybark DC, Williams JG (1976) Material Requirements Planning under uncertainty. Decis Sci 8(4)

    Article  Google Scholar 

  • Wijngaard J, Wortmann JC (1985) MRP and inventories. Eur J Oper Res 20:281–293

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Youssef Boulaksil .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2009 Springer-Verlag Berlin Heidelberg

About this chapter

Cite this chapter

Boulaksil, Y., Fransoo, J.C., van Halm, E.N.G. (2009). Setting safety stocks in multi-stage inventory systems under rolling horizon mathematical programming models. In: Meyr, H., Günther, HO. (eds) Supply Chain Planning. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-540-93775-3_8

Download citation

Publish with us

Policies and ethics