Abstract
The materials are the basis of the nuclear power plant construction. Effective nuclear power engineering material management can accelerate the construction and reduce project cost of the nuclear power plant. In order to put the design of the source data into engineering material management, regulate the process of material procurement management and provide material procurement data and design drawings data in real-time for site management, this paper proposed the solution of the engineering material EPC (engineering, procurement, construction) based on VPRM system and SAP system and finally realized it. This solution also solved the main problems existing in engineering material management business of the nuclear power plant construction, and meets the meticulous management concept at the same time.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Lewis, H.T., Livesey, C.A.: Materials management in the airframe industry. Harv. Bus. Rev. 22(4), 477–494 (2009)
Sillak, G.C.: Project code of accounts—as applied in engineering, procurement and construction for the process industries. Cost Eng. 44(7), 42–53 (2002)
(Kees) Berends, T.C.: Cooperative contracting on major engineering and construction projects. Eng. Econ. 51(1), 35–51 (2006)
Wu, T., Xu J., Tan Z.: Engineering material management pattern research and implementation for generation III nuclear power plant. In: Innovations bio-inspired Computing and Applications (IBICA), pp. 290–293 (2011)
Johansson, E.: Information management for materials supply systems design. Int. J. Prod. Res. 47(8), 2217–2229 (2009)
Kasim, N.B., Anumba, C.J., Dainty, A.R.J.: Improving materials management practices on fast-track construction projects. In: Khosrowshahi, F (ed.), 21st Annual ARCOM Conference, 7–9 Sept 2005. SOAS. University of London, Association of Researchers in Construction Management, vol. 2, pp. 793–802. (2005)
Perera, S., Karunasena, G.: Best value IT procurement for construction organizations. In: AACE International Transactions, pp. 1–10 (2004)
Evbuomwan, N.F.O., Anumba, C.J.: An integrated framework for concurrent lifecycle design and construction. Adv. Eng. Softw. 2(7–9), 587–597 (1998)
Perng, Y.-H., Chang, C.-L.: Data mining for government construction procurement. Build. Res. Inf. 32(4), 329–338 (2004)
Said, H., El-Rayes, K.: Optimizing material procurement and storage on construction sites. J. Const. Eng. Manage. 137(6), 421–431 (2011)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2013 Springer Science+Business Media New York
About this paper
Cite this paper
Tan, Z., Zhang, Z., Hu, L., Chen, S., Wang, Z. (2013). Engineering Material Management Platform for Nuclear Power Plant . In: Wong, W.E., Ma, T. (eds) Emerging Technologies for Information Systems, Computing, and Management. Lecture Notes in Electrical Engineering, vol 236. Springer, New York, NY. https://doi.org/10.1007/978-1-4614-7010-6_124
Download citation
DOI: https://doi.org/10.1007/978-1-4614-7010-6_124
Publisher Name: Springer, New York, NY
Print ISBN: 978-1-4614-7009-0
Online ISBN: 978-1-4614-7010-6
eBook Packages: EngineeringEngineering (R0)