Spectrum Requirements Estimation for the Future IMT Systems: Current Work and Way Forward

Abstract

In order to satisfy the spectrum requirements of the future international mobile telecommunication (IMT) systems, to realize scientific allocation and usage of spectrum resources and to avoid spectrum waste brought by allocation in advanced, there is a need to make a reasonable estimation for the spectrum demands of future IMT systems. The estimation results can also provide guidelines for the subsequent spectrum planning and assignment work. This paper gives a description of study progress of related spectrum estimation for future IMT systems. From the analysis of current work and practical situation, the key factors in the estimation methodology are summarized to provide a reference for the following work.


Share and Cite:

Pang, J. , Wang, T. , Li, J. and Huang, B. (2013) Spectrum Requirements Estimation for the Future IMT Systems: Current Work and Way Forward. Communications and Network, 5, 467-472. doi: 10.4236/cn.2013.53B2086.

Conflicts of Interest

The authors declare no conflicts of interest.

References

[1] Report ITU-R M.2243, “Assessment of the Global Mobile Broadband Deployments and Forecasts for International Mobile Telecommunications,” 2011.
[2] D. Mavrakis and M. Kamal-Saadi, “Mobile Broadband Access at Home: The Business Case for Femtocells, UMA and IMS/VCC Dual Mode Solutions,” Informa Telecoms and Media, 2008.
[3] S. Carlaw, “IPR and the Potential Effect on Femtocell Markets,” FemtoCells Europe, London, 2008.
[4] G. Mansfield, “Femto Cells in the US Market-Business Drivers and Consumer Propositions,” Femto Cells Europe, ATT, London, 2008.
[5] 3GPP Technical Report TR 36.814 v9.0.0, “Further Advancements for E-UTRA Physical Layer Aspects,” 2010.
[6] Report ITU-R M.1768, “Methodology for Calculation of Spectrum Requirements for the Future Development of the Terrestrial Component of IMT-2000 and Systems beyond IMT-2000,” 2006.
[7] Federal Communications Commission, “Mobile Broadband: The Benefits of Additional Spectrum,” 2010.
[8] Russian Federation, “Document 5D/118-E, Future IMT Spectrum Requirements Assessment for the Russian Federation”.
[9] GSMA, “A New Model for Spectrum ES-TIMATION,” 2012.
[10] B. Nie, Z. Y. Feng, Z. B. Feng and X. G. Song, “Frequency Planning of IMT Systems Based on the Hierarchical Spectrum Demand Forecast,” Telecommunications Science, 2012.
[11] China’s Ministry of Industry and Telecommunications Research Institute, “Spectrum Requirements Estimation of IMT Systems,” 57th Meeting of CCSA TC5 WG8.
[12] Report ITU-R M.2078, “Estimated Spectrum Bandwidth Re-quirements for the Future Development of IMT-2000 and IMT-Advanced,” 2006.
[13] Qualcomm Inc. “Document 5D/266-E, Information Related to the Level of Asymmetry between the Downlink and Uplink for Traffic in Response to Liaison from ITU-R JTG 4-5-6-7 on Spectrum Requirements,” 2013.

Copyright © 2024 by authors and Scientific Research Publishing Inc.

Creative Commons License

This work and the related PDF file are licensed under a Creative Commons Attribution 4.0 International License.