With Xiamen Jiaheyuan underground access as the project background, tunnel face stability of soft shallow tunnel was analyzed under the condition of no pre-reinforcement by means of three-dimensional finite element method. The results indicated that the ground was relaxed because the tensile stress appeared in front and top of tunnel face after excavation, at the same time, the ground into the plastic state around the tunnel face. From the point of view of deformation, the displacement of tunnel face were such as the longitudinal horizontal displacement reached the maximum, the vertical deposition following by, and the lateral horizontal displacement being the least. Further analysis showed that the longitudinal horizontal displacement in front of tunnel face mostly produced at 1.0D (one excavation width) distance before tunnel face, the maximum displacement was located at the center of tunnel face. The conclusions remind that engineers also pay attention to the tunnel face reinforcement in front and top of tunnel face to minimize the impact of surface environment during tunnel construction in soft shallow tunnels.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 1079-1080)

Pages:

170-176

Citation:

Online since:

December 2014

Export:

Price:

* - Corresponding Author

[1] Mei Zhirong, Chen Tao: Research on application of full-face pre-reinforcing technology in high speed railway tunnel. Tunnel Construction, Vol. 542-547, (2008), p.28.

Google Scholar

[2] Wang Mengshu: The technology theory of shallow mining in underground engineering (Anhui Education Press, P.R. China 2004).

Google Scholar

[3] F. Castelli, E. Motta: Numerical analysis for provision of tunneling – induced ground deformation in granular soil. Geotechnical aspects of underground construction in soft ground, 503-508, (2006).

DOI: 10.1201/noe0415391245.ch68

Google Scholar

[4] Guilloux, A. Kurdts, V. Bernhardt: A new stress-strain approach for tunnel face stability. Geotechnical aspects of underground construction in soft ground, 521-527, (2006).

DOI: 10.1201/noe0415391245.ch71

Google Scholar

[5] Peila D: A theoretical study of reinforcement influence on the stability of a tunnel face. Geotechnical and Geological Engineering, Vol. 145-68, (1994), p.12.

DOI: 10.1007/bf00426984

Google Scholar

[6] Chungsik Yoo: Finite-element analysis of tunnel face reinforced by longitudinal pipes. Computers and Geotechnics, Vol. 73-94, (2002), p.29.

DOI: 10.1016/s0266-352x(01)00020-9

Google Scholar

[7] Sung O. Choi, Hee-Soon Shin: Stability analysis of a tunnel excavated in a weak rock mass and the optimal supporting system design. SINOROCK2004 Symposium, Vol. 1-6, (2004), p.41.

DOI: 10.1016/j.ijrmms.2004.03.151

Google Scholar

[8] G. Galli, A. Grimaldi, A. Leonardi: Three-dimensional modelling of tunnel excavation and lining. Computers and Geotechnics, Vol. 171-183, (2004), p.31.

DOI: 10.1016/j.compgeo.2004.02.003

Google Scholar

[9] Xiamen Huayan Reconnaissance & Design CO.; LTD: Geological investigation report for Jiaheyuan underground parking project. (Xiamen Huayan Reconnaissance & Design CO.; LTD, P.R. China 2007).