Risk Evaluation Index System for Operation Security in High Slope Construction on Freeway Reconstruction and Extension

Article Preview

Abstract:

The risk evaluation index system for operation security in high slope construction was drawn up on the basis of characteristics analysis of operation security, combined with expert evaluation and fuzzy prioritization method. The evaluation index system includes four factors of geological conditions, operation environment, slope construction and traffic organization, which lays the foundation for correct evaluation the influence of high slope construction to operation security.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

1983-1986

Citation:

Online since:

October 2013

Export:

Price:

[1] J. Liu, J. Shen, Shanxi Science and Technology of Communications, 196 (2009) 59-61.

Google Scholar

[2] Y. He, J. Li, Journal of Highway and Transportation Research and Development, 29 (2012) 116-121.

Google Scholar

[3] S. Zhang, Z. Ma, Journal of Chang'an University (Natural Science Edition), 26 (2006) 78-81.

Google Scholar

[4] J. Xie, C. Liu, Application and Method of Fuzzy Mathematics, third ed., Huazhong University of Science and Technology Press, Wuhan, (2005).

Google Scholar

[5] L. Yang, L. Wang, Forest Engineering, 24 (2008) 80-83.

Google Scholar