[1] 刘检华, 孙清超, 程晖, 等. 产品装配技术的研究现状、技术内涵及发展趋势[J]. 机械工程学报, 2018, 54(11):2-28. LIU Jianhua, SUN Qingchao, CHENG Hui, et al. The state-of-the-art, connotation and developing trends of the products assembly technology[J]. Journal of Mechanical Engineering, 2018, 54(11):2-28. [2] 孙刚, 万毕乐, 刘检华, 等. 基于三维模型的卫星装配工艺设计与应用技术[J]. 计算机集成制造系统, 2011, 17(11):2343-2350. SUN Gang, WAN bile, LIU Jianhua, et al. Satellite assembly process design and application technology based on 3D model[J]. Computer Integrated Manufacturing System, 2011, 17(11):2343-2350. [3] FAZIO T, EDSALL A C, GUSTAVSON R E, et al. A prototype of feature-based design for assembly[J]. Journal of Mechanical Design, 1993, 115(4):369-392. [4] TAYLOR F W. The principles of scientific management[J]. History of Economic Thought Books, 1911, 7(9):723-724. [5] BRUCE G. Which work measurement tool[J]. Manufacturing Engineering, 1999, (3):18. [6] 李亚杰, 何卫平, 董蓉, 等. 基于制造执行系统数据采集的工时预测与进化[J]. 计算机集成制造系统, 2013, 19(11):2810-2818. LI Yajie, HE Weiping, DONG Rong, et al. Man hour prediction and evolution based on MES data collection[J]. Computer Integrated Manufacturing System, 2013, 19(11):2810-2818. [7] 杨青海, 祁国宁, 黄哲人, 等. 基于案例推理和事物特性表的零件工时估算方法[J]. 机械工程学报, 2007(5):99-105. YANG Qinghai, QI Guoning, HUANG Zheren, et al. Estimation method of parts working hours based on case-based reasoning and tabular layouts of thing characteristics[J]. Acta Mechanical Engineering, 2007(5):99-105. [8] 李鹏, 张树生, 周竞涛, 等. 成组技术在计算机辅助工时定额系统中的应用[J]. 计算机应用, 2003(S1):42-43. LI Peng, ZHANG Shusheng, ZHOU Jingtao, et al. Application of group technology in computer aided man hour quota system[J]. Computer Applications, 2003(S1):42-43. [9] 晁海涛, 徐锋, 许晨辉, 等. 复杂机电产品装配工时定额计算方法研究[J]. 机械制造与自动化, 2019, 48(5):22-24, 33. CHAO Haitao, XV Feng, XV Chenhui, et al. Study on calculation method of assembly time quota for complex mechanical and electrical products[J]. Mechanical Manufacturing and Automation, 2019, 48(5):22-24, 33. [10] 戴健伟, 吉华, 杨岗, 等. 基于GA_BP算法的化工设备设计人工时预测[J]. 计算机集成制造系统, 2013, 19(7):1665-1675. DAI Jianwei, JI hua, YANG Gang, et al. Based on GA_Artificial hour prediction of chemical equipment design based on BP algorithm[J]. Computer Integrated Manufacturing System, 2013, 19(7):1665-1675. [11] 李奇倚, 王磊. 基于决策树和模型树的作业工时估计方法[J]. 计算机集成制造系统, 2018, 24(2):309-320. LI Qiyi, WANG Lei. Estimation method of operation time based on decision tree and model tree[J]. Computer Integrated Manufacturing System, 2018, 24(2):309-320. [12] 习立洋, 吴娜, 吉永军, 等. 基于PSO-BP神经网络的船体分段任务包工时定额模型[J]. 船舶工程, 2020, 42(2):135-141. XI Liyang, WU Na, JI Yongjun, et al. Time quota model of ship block task contract based on PSO-BP neural network[J]. Shipbuilding Engineering, 2020, 42(2):135-141. [13] 史恭波, 邵家伟, 张浩, 等. 船舶精细化工时管理模式及应用[J]. 造船技术, 2020(3):86-92. SHI Gongbo, SHAO Jiawei, ZHANG Hao, et al. Management mode and application of ship fine chemical industry[J]. Shipbuilding Technology, 2020(3):86-92. [14] 石晶玉, 刘虹, 何苏, 等. 汽车铸件生产工时数理统计计算方法[J]. 吉林工业大学学报, 1998(3):103-106. SHI Jingyu, LIU Hong, HE Su, et al. Calculation method of mathematical statistics for production hours of automobile castings[J]. Journal of Jilin University of technology, 1998(3):103-106. [15] 洪湖鹏, 郁鼎文, 张玉峰, 等. 通用化计算机辅助工时系统的研究和开发[J]. 制造技术与机床, 2001(7):55-58. HONG hupeng, YU Dingwen, ZHANG Yufeng, et al. Research and development of general computer aided man hour system[J]. Manufacturing Technology and Machine Tool, 2001(7):55-58. [16] 付诚, 邱晓静, 秦肖艇. 基于SPDM系统的船舶设计工时管理和应用[J]. 船舶与海洋工程, 2020, 36(2):65-71. FU Cheng, QIU Xiaojing, QIN Xiaochuan. Ship design man hour management and application based on SPDM system[J]. Ship and Ocean Engineering, 2020, 36(2):65-71. |