248. 軽水炉1次冷却系配管信頼性実証試験の成果概要
柴田 勝之磯崎 敏邦植田 脩三栗原 良一鬼沢 邦雄鴻坂 厚夫
著者情報
ジャーナル フリー

1993 年 35 巻 10 号 p. 923-939

詳細
抄録

Upon request by the Science and Technology Agency of Japanese Government, the Japan Atomic Energy Research Institute has conducted Piping Reliability Test Program to demonstrate the safety and reliability of light water reactor primary pipings. In this report, the results of the program are summarized. In the test program, pipe fatigue tests, Leak-Before-Break (LBB) verification tests and pipe rupture tests were carried out to examine the integrity of pipings, to verify the LBB concept and to demonstrate the effectiveness of the protective measures against jet impingement and pipe whip under pipe rupture event, respectively. In the pipe fatigue tests, a procedure to predict the fatigue crack growth was developed and the integrity of piping during plant service life was demonstrated. In the LBB verification tests, pipe fracture tests and leak rate tests were performed using cracked pipes. Based on the test results, LBB in the primary pipings was demonstrated. In the pipe rupture tests, the influence of jet impingement on the target plate and the interaction between whipping pipe and restraint were investigated. Using the test results, the effect of jet impingement and the effectiveness of pipe whip restraints were demonstrated.

著者関連情報
© by the Atomic Energy Society of Japan
前の記事
feedback
Top