Developing Generic Dynamic Models for the 2030 Eastern Interconnection Grid
- Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
The Eastern Interconnection Planning Collaborative (EIPC) has built three major power flow cases for the 2030 Eastern Interconnection (EI) based on various levels of energy/environmental policy conditions, technology advances, and load growth. Using the power flow cases, this report documents the process of developing the generic 2030 dynamic models using typical dynamic parameters. The constructed model was validated indirectly using the synchronized phasor measurements by removing the wind generation temporarily.
- Research Organization:
- Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC05-00OR22725
- OSTI ID:
- 1113691
- Report Number(s):
- ORNL/TM-2013/545; TE1101000; CETE004
- Country of Publication:
- United States
- Language:
- English
Similar Records
Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection
Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection: Preprint
Co-optimizing Generation and Transmission Expansion with Wind Power in Large-Scale Power Grids Implementation in the US Eastern Interconnection
Conference
·
Tue Dec 19 00:00:00 EST 2023
·
OSTI ID:1113691
+2 more
Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection: Preprint
Conference
·
Mon Oct 16 00:00:00 EDT 2023
·
OSTI ID:1113691
+2 more
Co-optimizing Generation and Transmission Expansion with Wind Power in Large-Scale Power Grids Implementation in the US Eastern Interconnection
Journal Article
·
Tue Jan 12 00:00:00 EST 2016
· Electric Power Systems Research
·
OSTI ID:1113691
+1 more