Title |
Installation Progress at the PIP-II Injector Test at Fermilab |
Authors |
- C.M. Baffes, M.L. Alvarez, R. Andrews, A.Z. Chen, J. Czajkowski, P. Derwent, J.P. Edelen, B.M. Hanna, B.D. Hartsell, K.R. Kendziora, D.V. Mitchell, L.R. Prost, V.E. Scarpine, A.V. Shemyakin, J. Steimel, T.J. Zuchnik
Fermilab, Batavia, Illinois, USA
- A.L. Edelen
CSU, Fort Collins, Colorado, USA
|
Abstract |
A CW-compatible, pulsed H⁻ superconducting linac 'PIP-II' is being planned to upgrade Fermilab's injection complex. To validate the concept of the front-end of such a machine, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC 30 keV H⁻ ion source, a 2m-long LEBT, a 2.1 MeV CW RFQ, and a 10-m long MEBT that is capable of creating a large variety of bunch structures. The paper will report on the installation of the RFQ and the first sections of the MEBT and related mechanical design considerations.
|
Funding |
Fermilab is operated by Fermi Research Alliance, LLC under Contract No. De-AC02-07CH11359 with the United States Department of Energy |
Paper |
download WEPOA15.PDF [1.051 MB / 4 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
NAPAC2016, Chicago, IL, USA |
Series |
North American Particle Accelerator Conference (3rd) |
Proceedings |
Link to full NAPAC2016 Proccedings |
Session |
Poster Session (MC3 & MC4) |
Date |
12-Oct-16 08:30–12:30 |
Main Classification |
4: Hadron Accelerators |
Sub Classification |
A08 - Linear Accelerators |
Keywords |
ion, rfq, controls, MMI, linac |
Publisher |
JACoW, Geneva, Switzerland |
Editors |
Volker RW Schaa (GSI, Darmstadt, Germany); Maria Power (ANL, Argonne, IL, USA); Vladimir Shiltsev (FNAL, Batavia, IL, USA); Marion White (ANL, Argonne, IL, USA) |
ISBN |
978-3-95450-180-9 |
Published |
January 2017 |
Copyright |
|