Title |
Operation of the CEBAF 100 MV Cryomodules |
Authors |
- C. Hovater, T.L. Allison, R. Bachimanchi, G.H. Biallas, E. Daly, M.A. Drury, A. Freyberger, R.L. Geng, G.E. Lahti, R.A. Legg, C.I. Mounts, R.M. Nelson, T. E. Plawski, T. Powers
JLab, Newport News, Virginia, USA
|
Abstract |
The Continuous Electron Beam Accelerator Facility (CEBAF) 12 GeV upgrade reached its design energy in December of 2015. Since then CEBAF has been delivering 12 GeV beam to experimental Hall D and 11 GeV to experimental halls A and B in support of Nuclear physics. To meet this energy goal, ten new 100 MV cryomodules (80 cavities) and RF systems were installed in 2013. The superconducting RF cavities are designed to operate CW at a average accelerating gradient of 19.2 MV/m. To support the higher gradients and higher QL (3.2×107) operations, the RF system uses 13 kW klystrons and digital LLRF to power and control each cavity. This paper reports on the C100 operation and optimization improvements of the RF system and cryomodules.
|
Funding |
Authored by JSA, LLC under U.S. DOE Contract DE-AC05- 06OR23177. |
Paper |
download MOOP11.PDF [0.822 MB / 3 pages] |
Slides |
download MOOP11_TALK.PDF [1.574 MB] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
LINAC2016, East Lansing, MI, USA |
Series |
Linear Accelerator Conference (28th) |
Proceedings |
Link to full LINAC2016 Proccedings |
Session |
Oral Poster Session |
Date |
26-Sep-16 15:00–16:00 |
Main Classification |
1 Electron Accelerators and Applications |
Sub Classification |
1A Electron Linac Projects |
Keywords |
cryomodule, cavity, operation, electron, controls |
Publisher |
JACoW, Geneva, Switzerland |
Editors |
Yoshishige Yamazaki (FRIB/MSU, East Lansing, MI, USA); Alberto Facco (FRIB/MSU, East Lansing, MI, USA); Amy McCausey (FRIB/MSU, East Lansing, MI, USA); Volker RW Schaa (GSI, Darmstadt, Germany) |
ISBN |
978-3-95450-169-4 |
Published |
May 2017 |
Copyright |
|