Title |
Early Commissioning Simulation of the Diamond Storage Ring Upgrade |
Authors |
- H. Ghasem, M. Apollonio, R. Bartolini, J.P. Kennedy, I.P.S. Martinpresenter
DLS, Oxfordshire, United Kingdom
|
Abstract |
A low beam emittance lattice has been designed for up-grade of the Diamond storage ring. Due to the use of strong focusing elements and rather small vacuum cham-ber and considering the required short dark time, commis-sioning of the designed storage ring becomes very chal-lenging. This paper briefly explains the progress of early commissioning simulations of the storage ring, gives the required engineering tolerances, presents the first simula-tion results and discusses the non-linear beam dynamics (NLBD) issues after successful commissioning with and without insertion devices (IDs).
|
Paper |
download TUPGW076.PDF [2.224 MB / 4 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IPAC2019 |
Series |
International Particle Accelerator Conference (10th) |
Location |
Melbourne, Australia |
Date |
19-24 May 2019 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Mark Boland (UoM, Saskatoon, SK, Canada); Hitoshi Tanaka (KEK, Tsukuba, Japan); David Button (ANSTO, Kirrawee, NSW, Australia); Rohan Dowd (ANSTO, Kirrawee, NSW, Australia); Volker RW Schaa (GSI, Darmstadt, Germany); Eugene Tan (ANSTO, Kirrawee, NSW, Australia) |
Online ISBN |
978-3-95450-208-0 |
Received |
13 May 2019 |
Accepted |
22 May 2019 |
Issue Date |
21 June 2019 |
DOI |
doi:10.18429/JACoW-IPAC2019-TUPGW076 |
Pages |
1577-1580 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 3.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|