Experimental study on the construction shape-forming process and static behaviour of a double strut cable dome

双撑杆索穹顶施工成形和静力性能试验研究

  • Published:
Journal of Zhejiang University-SCIENCE A Aims and scope Submit manuscript

Abstract

A double strut cable dome structural system was presented to improve the mechanical behaviour of a cable dome. This structure has good stability and is convenient to construct. To investigate its construction method and static performance, a structural model with a 6-m diameter was designed. From the nodal equilibrium equation, the calculation formulas for the prestress distribution with self-weight considered were deduced. Two types of construction methods, namely, assembling at high altitude and integral lifting, were adopted in the shape-forming process of the double strut cable dome, monitoring the internal force of the cable-strut components and the structural deformation. According to loading tests under full-span load and half-span load, the static behaviour of the structure was obtained and compared with the results from finite element analysis. Using the formulas deduced in this paper, the actual initial prestress considering self-weight for a double strut cable dome can be obtained accurately. This structure was suitable for tensioning the outer diagonal cables to apply prestress. Combined with the construction method for integral lifting, the difficulty and workload of the construction process can clearly be reduced, making the structure favourable for engineering application. Under an external load, the internal force of the ridge cables and inner diagonal cables decreases and the internal force of the other components increases. The results of the model tests were in good agreement with those of the finite element analysis.

中文概要

目的

提出一种稳定性好、便于张拉施工的双撑杆索穹 顶结构,以解决该结构的找力分析问题,并考察 其施工方法和静力性能,为工程实践提供参考依 据。

方法

1. 通过节点平衡方程,推导出考虑结构自重时的 双撑杆索穹顶结构的预应力分布计算公式;2. 通 过模型试验,比较采用空中组装和整体提升两种 施工方法时,结构的内力和位形变化;3. 进行满跨荷载和半跨荷载的加载测试,并与有限元分 析结果进行了对比。

结论

1. 本文所得公式可以准确得到双撑杆索穹顶结构 考虑自重后的实际预应力分布。2. 该结构适合通 过张拉外斜索施加预应力;结合整体提升的施工 方法,可以显著降低施工难度,使其更适用于实 际工程。3. 在外荷载作用下,双撑杆索穹顶结构 中脊索和内斜索的内力减小,其他斜索和环索的 内力增大。

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Ding MM, Luo B, Guo ZX, et al., 2015. Integral tow-lifting construction technology of a tensile beam-cable dome. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 16(12):935–950. https://doi.org/10.1631/jzus.A1500189

    Article  Google Scholar 

  • Dong SL, Yuan XF, 2008. Advances in research on cable domes. Journal of Zhejiang University (Engineering Science), 42(1):1–7 (in Chinese).

    Google Scholar 

  • Fu F, 2005. Structural behavior and design methods of tensegrity domes. Journal of Constructional Steel Research, 61(1):23–35. https://doi.org/10.1016/j.jcsr.2004.06.004

    Article  Google Scholar 

  • Fuller RB, 1975. Synergetics: Explorations in the Geometry of Thinking. Macmillan Publishing Co., New York, USA.

    Google Scholar 

  • Gao Z, Xue S, He Y, 2015a. Analysis of design and construction integration of rigid bracing dome. Advances in Structural Engineering, 18(11):1947–1958. https://doi.org/10.1260/1369-4332.18.11.1947

    Article  Google Scholar 

  • Gao Z, Xue S, He Y, et al., 2015b. Construction forming and mechanical properties test of rigid bracing dome. Journal of Building Structures, 36(10):29–36 (in Chinese).

    Google Scholar 

  • Gasparini DA, Perdikaris PC, Kanj N, 1989. Dynamic and static behavior of cable dome model. Journal of Structural Engineering, 115(2):363–381. https://doi.org/10.1061/(ASCE)0733-9445(1989)115:2(363)

    Article  Google Scholar 

  • Ge J, Zhang A, Liu X, et al., 2012. Analysis of tension form-finding and whole loading process simulation of cable dome structure. Journal of Building Structures, 33(4):1–11 (in Chinese).

    Google Scholar 

  • Geiger DH, Stefaniuk A, Chen D, 1986. The design and construction of two cable domes for the Korean Olympics. Proceedings of the IASS Symposium on Shells, Membranes and Space Frames, 2:265–272.

    Google Scholar 

  • Hanaor A, 1988. Prestressed pin-jointed structures—flexibility analysis and prestress design. Computers & Structures, 28(6):757–769. https://doi.org/10.1016/0045-7949(88)90416-6

    Article  MATH  Google Scholar 

  • Huang CW, Deng Y, Song WM, 1999. Experiment analysis of cable dome structure. Spatial Structure, 3:40–46.

    Google Scholar 

  • Kan Y, Ye JH, 2008. Form finding and loading experiment of cable domes. Engineering Mechanics, 25(8):205–211 (in Chinese).

    Google Scholar 

  • Lee K, Han S, Park T, 2012. Stabilization process analysis of cable dome structure. International Journal of Steel Structures, 12(4):495–507. https://doi.org/10.1007/s13296-012-4004-4

    Article  Google Scholar 

  • Levy MP, 1994. The Georgia dome and beyond: achieving lightweight-longspan structures. Spatial, Lattice and Tension Structures: Proceedings of the IASS-ASCE International Symposium 1994; Held in Conjunction with the ASCE Structures Congress XII, p.560–562.

    Google Scholar 

  • Pellegrino S, 1992. A class of tensegrity domes. International Journal of Space Structures, 7(2):127–142. https://doi.org/10.1177/026635119200700206

    Article  Google Scholar 

  • Pellegrino S, 1993. Structural computations with the singular value decomposition of the equilibrium matrix. International Journal of Solids and Structures, 30(21):3025–3035. https://doi.org/10.1016/0020-7683(93)90210-X

    Article  MATH  Google Scholar 

  • Quagliaroli M, Malerba PG, Albertin A, et al., 2015. The role of prestress and its optimization in cable domes design. Computers & Structures, 161:17–30. https://doi.org/10.1016/j.compstruc.2015.08.017

    Article  Google Scholar 

  • Taniguchi T, Ishii K, Toda I, et al., 1987. Report on experiments concerning tension dome. Proceedings of International Colloquium on Space Structures for Sports Buildings, 1:550–557.

    Google Scholar 

  • Terry WR, 1994. Georgia dome cable roof construction techniques. Spatial, Lattice and Tension Structures: Proceedings of the IASS-ASCE International Symposium 1994; Held in Conjunction with the ASCE Structures Congress XII, p.563–572.

    Google Scholar 

  • Yamaguchi I, Okada K, Kimura M, et al., 1987. A study on the mechanism and structural behaviors of cable dome. Proceedings of International Colloquium on Space Structures for Sports Buildings, p.534–549.

    Google Scholar 

  • Yuan X, Chen L, Dong S, 2007. Prestress design of cable domes with new forms. International Journal of Solids and Structures, 44(9):2773–2782. https://doi.org/10.1016/j.ijsolstr.2006.08.026

    Article  MATH  Google Scholar 

  • Yuan XF, Dong SL, 2003. Integral feasible prestress state of cable domes. Computers & Structures, 81(21):2111–2119. https://doi.org/10.1016/S0045-7949(03)00254-2

    Article  Google Scholar 

  • Zhang A, Liu X, Li J, et al., 2012. Static experimental study on large-span cable dome structure. Journal of Building Structures, 33(4):54–59 (in Chinese).

    Google Scholar 

  • Zhang G, Ge J, Wang S, et al., 2012. Design and research on cable dome structural system of the National Fitness Center in Ejin Horo Banner, Inner Mongolia. Journal of Building Structures, 33(4):12–22 (in Chinese).

    Google Scholar 

  • Zhang LM, Chen WJ, Dong SL, 2007. Initial pre-stress finding procedure and structural performance research for Levy cable dome based on linear adjustment theory. Journal of Zhejiang University-SCIENCE A, 8(9):1366–1372. https://doi.org/10.1631/jzus.2007.A1366

    Article  MATH  Google Scholar 

  • Zheng JH, Luo YZ, Dong SL, et al., 2008. Model experimental research on rectangular cable dome. Journal of Building Structures, 29(2):25–31 (in Chinese).

    Google Scholar 

  • Zhou JY, Chen WJ, Zhao B, et al., 2015. Distributed indeterminacy evaluation of cable-strut structures: formulations and applications. Journal of Zhejiang University-SCIENCE A (Applied Physics & Engineering), 16(9):737–748. https://doi.org/10.1631/jzus.A1500081

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Zi-qin Jiang.

Additional information

Project supported by the National Natural Science Foundation of China (No. 51608014), the Beijing Natural Science Foundation (Nos. 8174060 and 8131002), and the China Postdoctoral Science Foundation (No. 2017T100020)

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Zhang, Al., Sun, C. & Jiang, Zq. Experimental study on the construction shape-forming process and static behaviour of a double strut cable dome. J. Zhejiang Univ. Sci. A 19, 225–239 (2018). https://doi.org/10.1631/jzus.A1700071

Download citation

  • Received:

  • Revised:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1631/jzus.A1700071

Key words

CLC number

关键词

Navigation