On control of construction party on engineering progressChinese Full Text
ZHANG Zhi-gang;ZHAO Bin;Logistic Management Office,Second Hospital of Shanxi Medical University;
Abstract: According to the analysis and forecasting of problems in the progress control of construction party and the influential factors for the engineering progress,points out the measures of the construction party on the engineering progress control,and illustrates the measures to ensure the engineering progress from the engineering preparation,the progress planning,the investment and contract management,so as to realize the active control over the engineering progress.
- DOI:
10.13719/j.cnki.cn14-1279/tu.2014.19.154
- Series:
- Subject:
- Classification Code:
TU722
- Mobile Reading
Read on your phone instantly
Step 1
Scan QR Codes
"Mobile CNKI-CNKI Express" App
Step 2
Open“CNKI Express”
and click the scan icon in the upper left corner of the homepage.
Step 3
Scan QR Codes
Read this article on your phone.
- HTML
- CAJ Download
- PDF Download
Download the mobile appuse the app to scan this coderead the article.
Tips: Please download CAJViewer to view CAJ format full text.
Download: 80 Page: 268-270 Pagecount: 3 Size: 1000K
Citation Network
Related Literature
- Similar Article
- Reader Recommendation
- Associated Author