Knowledge Network Node

Study of cutting slope and unloading scheme for No.1 loose rock mass in the right bank of Yagen hydropower stationChinese Full Text

HUANG Yi-sheng

Abstract: Through studying the qeological conditions of loose body and ship model,the water and earthquake condition at the same time is used to confirm the cutting slope and unloading scheme for No.1 loose rock mass in the right bank of Yagen hydropower station.It shows the excavation platform height for No.1 loose rock mass is 2 565 m and the prestressed anchor support scheme is the best choice for the excavation slope.
  • DOI:

    10.13719/j.cnki.cn14-1279/tu.2010.36.073

  • Series:

  • Subject:

  • Classification Code:

    TV223

  • Mobile Reading
    Read on your phone instantly
    Step 1

    Scan QR Codes

    "Mobile CNKI-CNKI Express" App

    Step 2

    Open“CNKI Express”

    and click the scan icon in the upper left corner of the homepage.

    Step 3

    Scan QR Codes

    Read this article on your phone.

  • HTML
  • CAJ Download
  • PDF Download

Download the mobile appuse the app to scan this coderead the article.

Tips: Please download CAJViewer to view CAJ format full text.

Download: 103 Page: 64-65 Pagecount: 2 Size: 178K

Related Literature
  • Similar Article
  • Reader Recommendation
  • Associated Author