Determination on Work Resistance of Support for Fully Mechanized Mining Face with Large HeightChinese Full Text
KONG Dezhong;REN Zhicheng;GENG Huale;School of Resources and Safety Engineering,China University of Mining and Technology(Beijing);
Abstract: Aiming at the specific geological mining conditions of 2612 working face in Dongpang Mine,using the experience estimation method,the " voussoir beam" theory,the roof classification method,the dynamic load calculation method,with the help of the site measurement and comparing with the principle and results of four kinds of calculation methods,this article calculated support working resistance of 2612 working face during depression mining,up- dip mining,nearly horizontal mining phase,and concluded that the powered support of ZY10800 /30 /65D would meet the production requirements; the support working resistance of up- dip mining is largest; the dynamic load method can determine the support working resistance of fully mechanized mining face with large mining height.
Keywords:
fully mechanized mining face with large mining height; support working resistance; dynamic load method;
- DOI:
10.13347/j.cnki.mkaq.2014.07.049
- Series:
- Subject:
- Classification Code:
TD355.4
- Mobile Reading
Read on your phone instantly
Step 1Scan QR Codes
"Mobile CNKI-CNKI Express" App
Step 2Open“CNKI Express”
and click the scan icon in the upper left corner of the homepage.
Step 3Scan QR Codes
Read this article on your phone.
- HTML
- CAJ Download
- PDF Download
Download the mobile appuse the app to scan this coderead the article.
Tips: Please download CAJViewer to view CAJ format full text.
Download: 237 Page: 163-165+168 Pagecount: 4 Size: 1082K
Citation Network
Related Literature
- Similar Article
- Reader Recommendation
- Associated Author