The KSTAR project: An advanced steady state superconducting tokamak experiment

, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , and

Published under licence by IOP Publishing Ltd
, , Citation G.S. Lee et al 2000 Nucl. Fusion 40 575 DOI 10.1088/0029-5515/40/3Y/319

0029-5515/40/3Y/575

Abstract

The Korea Superconducting Tokamak Advanced Research (KSTAR) project is the major effort of the national fusion programme of the Republic of Korea. Its aim is to develop a steady state capable advanced superconducting tokamak to establish a scientific and technological basis for an attractive fusion reactor. The major parameters of the tokamak are: major radius 1.8 m, minor radius 0.5 m, toroidal field 3.5 T and plasma current 2 MA, with a strongly shaped plasma cross-section and double null divertor. The initial pulse length provided by the poloidal magnet system is 20 s, but the pulse length can be increased to 300 s through non-inductive current drive. The plasma heating and current drive system consists of neutral beams, ion cyclotron waves, lower hybrid waves and electron cyclotron waves for flexible profile control in advanced tokamak operating modes. A comprehensive set of diagnostics is planned for plasma control, performance evaluation and physics understanding. The project has completed its conceptual design and moved to the engineering design and construction phase. The target date for the first plasma is 2002.

Export citation and abstract BibTeX RIS