Abstract
A flexible manufacturing system (FMS) is highly capital-intensive and FMS users are concerned with achieving high system utilization. The production planning function for setting up an FMS prior to production should be developed in order to make the most of the potential benefits of FMSs. We consider two production planning problems of grouping and loading a flexible flow system, which is an important subset of FMSs where the routing of parts is unidirectional. We show that considering this routing restriction as well as limited machine flexibility strongly affects both the solution techniques and the quality of the solutions. Because of the complexity of the problem, we present a heuristic approach that decomposes the original problem into three interrelated subproblems. We show that the proposed approach usually finds a near-optimum solution and is superior to an approach that exists in the literature of FMS production planning. We also introduce effective heuristic methods for two new subproblems that arise because of the unidirectional flow precedence and flexibility constraints. Computational results are reported and future research issues are discussed.
Similar content being viewed by others
References
Kamath, M., Suri, R. and Sanders, J. (1988) Analytical perfor-mance models for closed-loop flexible assembly systems. Interna-tional Journal of Flexible Manufacturing Systems, 1, 51-84.
Harmon, R.L. and Peterson, L.D. (1990) Reinventing the Factory, The Free Press, New York, NY.
Afentakis, P. (1989) A loop layout design problem for flexible manufacturing systems. International Journal of Flexible Manu-facturing Systems, 1, 175-196.
Stecke, K.E. (1983) Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems. Management Science, 29, 273-288.
Stecke, K.E. and Solberg, J.J. (1985) The optimality of unbal-ancing both workloads and machine group sizes in closed queueing networks of multi-server queues. Operations Research, 33, 882-910.
Dallery, Y. and Stecke, K.E. (1990) On the optimal allocation of servers and workloads in closed queueing networks. Operations Research, 38, 694-703.
Berrada, M. and Stecke, K.E. (1986) A branch and bound ap-proach for machine load balancing in flexible manufacturing systems. Management Science, 32, 1316-1335.
Kim, Y.-D. and Yano, C.A. (1993) Heuristic approaches for loading problems in flexible manufacturing systems. IIE Trans-actions, 25, 26-39.
Shanker, K. and Tzen, Y.J. (1985) A loading and dispatching problem in a random flexible manufacturing system. International Journal of Production Research, 23, 579-595.
Ammons, J.C., Lofgren, C.B. and McGinnis, L.F. (1985) A large scale machine loading problem in flexible assembly. Annals of Operations Research, 3, 319-332.
Lashkari, R.S., Dutta, S.P. and Padhye, A.M. (1987) A new formulation of operation allocation problem in flexible manu-facturing systems: mathematical modeling and computational experience. International Journal of Production Research, 25, 1267-1283.
Stecke, K.E. and Solberg, J.J. (1981) Loading and control policies for a flexible manufacturing system. International Journal of Production Research, 19, 481-490.
Greene, T.J. and Sadowski, R.P. (1986) A mixed integer program for loading and scheduling multiple flexible manufacturing cells. European Journal of Operational Research, 24, 379-386.
Stecke, K.E. (1986) A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems. European Journal of Operations Research, 24, 369-378.
Kim, Y.-D. and Yano, C.A. (1992) An iterative approach to system setup problems in flexible manufacturing systems. Inter-national Journal of Flexible Manufacturing Systems, 4, 183-209.
Templemeier, H. and Kuhn, H. (1993) FMSs: Decision Support for Design and Operation, John Wiley, New York, NY.
Baybars, I. (1986) A survey of exact algorithms for the simple assembly line balancing problem. Management Science, 32, 909- 932.
Stecke, K.E. and Kim, I. (1991) A flexible approach to part type selection in flexible flow systems using part mix ratios. Interna-tional Journal of Production Research, 29, 53-75.
Smith, T. and Stecke, K.E. (1996) On the robustness of using balanced part mix ratios to determine cyclic part input sequences into flexible flow systems. International Journal of Production Research, 34, 2925-2941.
Sethi, A.K. and Sethi, S.P. (1990) Flexibility in manufacturing: a survey. International Journal of Flexible Manufacturing Systems, 2, 289-328.
Singh, N. (1996) Systems Approach to Computer-Integrated Design and Manufacturing, John Wiley, New York, NY.
Lee, H.F. and Johnson, R.V. (1991) A balancing strategy for designing flexible assembly systems. International Journal of Flexible Manufacturing Systems, 3, 91-120.
Suri, R. and Hildebrant, R. (1984) Modeling flexible manufac-turing systems using mean-value analysis. Journal of Manufac-turing Systems, 3, 27-38.
Kouvelis, P. and Lee, H.L. (1995) An improved algorithm for optimizing a closed queueing network model of a flexible manu-facturing system. IIE Transactions, 27, 1-8.
Solberg, J.J. (1977) A mathematical model of computerized man-ufacturing systems, in The 4th International Conference on Pro-duction Research, Tokyo, Japan, Taylor & Francis, London, pp. 22-30.
Reiser, M. and Lavenberg, S. (1980) Mean-value analysis of closed multichain queueing networks. Journal of Association Computing Machinery, 27, 313-322.
Graves, S.C. and Redfield, C.H. (1988) Equipment selection and task assignment for multiproduct assembly system design. Inter-national Journal of Flexible Manufacturing Systems, 1, 31-50.
Liu, C.-M. and Sanders, J. (1988) Stochastic design optimization of asynchronous flexible assembly systems. Annals of Operations Research, 15, 131-154.
Stecke, K.E. (1986) On the nonconcavity of throughput in certain closed queueing networks. Performance Evaluation, 6, 293-305.
Lee, H.F., Srinivasan, M.M. and Yano, C.A. (1991) Character-istics of optimal workload allocation in closed queueing networks. Performance Evaluation, 12, 255-268.
Lee, H.F., Srinivasan, M.M. and Yano, C.A. (1990) A framework for capacity planning and machine configuration for flexible as-sembly systems. Technical report 90-10, Department of Industrial and Operations Engineering, The University of Michigan, Ann Arbor, MI.
Baker, K.E. (1974) Introduction to Sequencing and Scheduling, John Wiley, New York, NY.
Talbot, F.B. and Patterson, J.H. (1984) An integer programming algorithm with network cuts solving the assembly line balancing problem. Management Science, 30, 85-99.
Aho, A., Hopcroft, J. and Ullman, J. (1974) The Design and Analysis of Computer Algorithms, Addison-Wesley, Reading, MA.
Lee, H.F. and Dooly, D.R. (1996) Algorithms for the constrained maximum-weight connected graph problem. Naval Research Lo-gistics, 43, 985-1008.
Lee, H.F., Srinivasan, M.M. and Yano, C.A. (1991) The optimal configuration and workload allocation problem in flexible man-ufacturing systems. International Journal of Flexible Manufactur-ing Systems, 3, 213-230.
Johnson, R.V. (1988) Optimally balancing large assembly lines with ‘FABLE’. Management Science, 34, 240-253.
Lee, H.F. (1989) A methodology for capacity planning in flexible assembly systems. Ph.D. dissertation, Department of Industrial and Operations Engineering, The University of Michigan, Ann Arbor, MI.
Calabrese, J.M. (1992) Optimal workload allocation in open networks of multiserver queues. Management Science, 38, 1792- 1802.
Author information
Authors and Affiliations
Rights and permissions
About this article
Cite this article
Lee, H.F., Stecke, K.E. Production planning for flexible flow systems with limited machine flexibility. IIE Transactions 30, 669–684 (1998). https://doi.org/10.1023/A:1007546428920
Issue Date:
DOI: https://doi.org/10.1023/A:1007546428920