Copyright © 2003 Elsevier B.V. All rights reserved.
An approximability result of the multi-vehicle scheduling problem on a path with release and handling times
Received 17 March 2003;
References and further reading may be available for this article. To view references and further reading you must purchase this article.
Abstract
In this paper, we consider a scheduling problem of vehicles on a path G with n vertices and n−1 edges. There are m identical vehicles. Each vertex in G has exactly one job. Any of the n jobs must be processed by some vehicle. Each job has a release time and a handling time. With the edges, symmetric travel times are associated. The problem asks to find an optimal schedule of the m vehicles that minimizes the maximum completion time of all the jobs. The problem is known to be NP-hard for any fixed m
2. In this paper, we show that the problem with a fixed m admits a polynomial time approximation scheme. Our algorithm can be extended to the case where G is a tree so that a polynomial time approximation scheme is obtained if m and the number of leaves in G are fixed.
Author Keywords: Discrete optimization; Vehicle scheduling; Polynomial time approximation scheme; Dynamic programming






E-mail Article
Add to my Quick Links

Cited By in Scopus (5)

} for the sytongly NP-hard problem of scheduling 




