ScienceDirect® Home Skip Main Navigation Links
You have guest access to ScienceDirect. Find out more.
 
Home
Browse
My Settings
Alerts
Help
 Quick Search
 Search tips (Opens new window)
    Clear all fields    
advertisementadvertisement
Discrete Applied Mathematics
Volume 156, Issue 5, 1 March 2008, Pages 556-568
 
Font Size: Decrease Font Size  Increase Font Size
 Abstract - selected
Article
Purchase PDF (194 K)

  E-mail Article   
  Add to my Quick Links   
Bookmark and share in 2collab (opens in new window)
Request permission to reuse this article
  Cited By in Scopus (0)
 
 
 
Related Articles in ScienceDirect
View More Related Articles
 
View Record in Scopus
 
doi:10.1016/j.dam.2006.03.039    How to Cite or Link Using DOI (Opens New Window)
Copyright © 2007 Elsevier B.V. All rights reserved.

Batch processing with interval graph compatibilities between tasks

Gerd Finkea, E-mail The Corresponding Author, Vincent Josta, E-mail The Corresponding Author, Maurice Queyrannea, E-mail The Corresponding Author and András Sebőa, E-mail The Corresponding Author

aLaboratoire Leibniz-IMAG, Grenoble, France

Received 4 October 2004; 
revised 1 March 2006; 
accepted 3 March 2006. 
Available online 19 April 2007.

Purchase the full-text article



References and further reading may be available for this article. To view references and further reading you must purchase this article.

Abstract

We analyze batch-scheduling problems that arise in connection with certain industrial applications. The models concern processing on a single max-batch machine with the additional feature that the tasks of the same batch have to be compatible. Compatibility is a symmetric binary relation—the compatible pairs are described with an undirected “compatibility graph”, which is often an interval graph according to some natural practical conditions that we present. We consider several models with varying batch capacities, processing times or compatibility graphs. We summarize known results, and present a min–max formula and polynomial time algorithms.

Keywords: Batch-scheduling; Task compatibilities; Interval graphs; Perfect graphs; Bounded coloring; Max-coloring

Article Outline

1. Introduction
2. Industrial applications
3. Batch-scheduling models
4. Definitions and notations from graph theory
5. Solution methods
5.1. Problem (P1)
5.2. Problem (P2)
5.3. Problem (P3)
5.4. Problem (P4)
6. Batching with release dates and other extensions
Acknowledgements
References








 
Home
Browse
My Settings
Alerts
Help
Elsevier.com (Opens new window)
About ScienceDirect  |  Contact Us  |  Information for Advertisers  |  Terms & Conditions  |  Privacy Policy
Copyright © 2008 Elsevier B.V. All rights reserved. ScienceDirect® is a registered trademark of Elsevier B.V.