Flow-shop scheduling for three serial stations with the last two duplicate
Available online 2 October 2003.
References and further reading may be available for this article. To view references and further reading you must purchase this article.
Abstract
This paper addresses the problem of scheduling jobs for three serial stations with the last two duplicate, i.e., identical. The performance measure considered is the makespan, and a Branch and Bound and two heuristic procedures are proposed. Two dominance criteria are developed to produce the optimal schedule for the jobs sequenced so far. Extensive computational experiments reveal that the Genetic Algorithm can be used to obtain a group of effective solutions for any realistic size problem within small computation time.
Author Keywords: Scheduling; Serial and duplicate stations; Branch and bound; Genetic algorithm
Article Outline
- 1. Introduction
- 2. Problem description and formulation
- 3. Solution procedures
- 4. Computational results
- 4.1. Data generation
- 4.2. Evaluating algorithms over small size problems
- 4.3. Evaluating the GA and HHA over large size problems
- 4.4. Sensitivity analysis
- 5. Conclusions
- Acknowledgements
- Appendix A. Presentation of the B&B algorithm
- References
- Vitae






E-mail Article
Add to my Quick Links

Cited By in Scopus (2)