 Abstract - selected
Article
Purchase PDF (942 K)

Article Toolbox
 
 
 
Related Articles in ScienceDirect
View More Related Articles
 
View Record in Scopus
 
doi:10.1016/S0957-4174(01)00029-X    
How to Cite or Link Using DOI (Opens New Window)

Copyright © 2001 Elsevier Science Ltd. All rights reserved.

Knowledge based approach for productivity adjusted construction schedule

Purchase the full-text article



References and further reading may be available for this article. To view references and further reading you must purchase this article.

Abdulrezak N. MohamedCorresponding Author Contact Information, E-mail The Corresponding Author

Department of Civil Engineering, Eastern Mediterranean University, Gazimagusa, Mersin 10, Turkey


Available online 16 August 2001.

Abstract

The nature of the construction industry always resists the adoption of management techniques that is successful in other disciplines. Unlike the manufacturing industry each construction project presents a unique planning problem to project planners and managers. The construction process is carried out at a new location and materials, labor and equipment are transported to a new job site. The construction is one of few processes in which the product is built in an open environment subject to various weather conditions and other environmental factors which affect labor as well as equipment productivity. This paper presents a knowledge based approach for analysis of different factors that affect construction project duration and generates normal schedules and productivity-adjusted schedules. Project mangers can be greatly aided by such automated system by simulating different factors that reflect anticipated and unanticipated project conditions and perform several schedule alternatives. An analysis of alternative schedules by using the integrated knowledge based system is presented. The knowledge based system interfaces to estimating software, spreadsheet and scheduling soft wares in order to receive data and generate schedule reports.

Author Keywords: Building estimating; Planning; Scheduling; Productivity; Expert systems

Article Outline

1. Introduction
2. Application of expert system in construction scheduling
3. Structure of knowledge base
4. System development
4.1. Knowledge acquisition
4.2. Knowledge representation
4.2.1. Knowledge library classes
4.2.1.1. Crew library class
4.2.1.2. Productivity level library class
4.2.1.3. Weather library classs
4.2.2. Selection classes
4.2.3. Project classes
4.3. Process modules
4.3.1. Schedule process module
4.3.2. Productivity analysis process
4.4. Adjusting activity durations
4.5. System evaluation
5. Conclusions
Acknowledgements
References








Corresponding Author Contact Information Tel.: +90-3-926-302359; fax: +90-3-923-650710; email: abdulrezak.mohamed@emu.edu.tr


 
Home
Browse
My Settings
Alerts
Help
Elsevier.com (Opens new window)
About ScienceDirect  |  Contact Us  |  Information for Advertisers  |  Terms & Conditions  |  Privacy Policy
Copyright © 2008 Elsevier B.V. All rights reserved. ScienceDirect® is a registered trademark of Elsevier B.V.