Open shop problem with zero-one time operations and integer release date/deadline intervals
Received 31 January 1995;
References and further reading may be available for this article. To view references and further reading you must purchase this article.
Abstract
We study the problem of constructing a minimum makespan schedule for the n-jobm-machine open shop with zero-one time operations and integer release dates and deadlines. The general scheduling problem is shown to be NP-complete. Two polynomial-time algorithms are given for the following special cases: (1) all possible mn operations have unit execution time, and (2) at most m + n operations have unit execution time. Next, the second algorithm is generalized to bounded cyclicity graphs. All the algorithms are capable of minimizing not only makespan but maximum lateness and maximum tardiness as well.
Author Keywords: Bipartite graph; Deadline; Edge-coloring; NP-completeness; Open-shop; Polynomial algorithm; Release date; Scheduling
Mathematical subject codes: 90B15; 05C15; 68R10; 05C90