Abstract
To make sure the tension adjustment in the cables of concrete cable-stayed bridges is conducted successfully, a new adjustment technique for the tension adjustment is presented, with the cable-girder temperature difference taken into account. The tensions are measured via frequency method. Prior to the tension adjustment, tensions and temperatures of all cables and girders are measured when the ambient temperature is stable, and this set of tensions is taken as reference tensions. During the tension adjustment, the relative variable quantities of the tensions are regarded as the control values, while the vertical displacement in the mid-span section of the main span is regarded as the verification value. After each pair of cables is adjusted, it is required to measure the temperatures of cables and girders as well as the vertical displacement variation in the mid-span section of the main span. To guarantee the structural behavior of entire bridge is controlled, at one-third cable points, two-third cable points and the farthest cable points, the frequencies of each pair of cables as well as the temperatures of each pair of cables and girders should be measured so as to recalculate the cable tensions. After that, these cable tensions are compared with the theoretical ones to ensure the structural behavior of entire bridge in control. Finally, Furong bridge, a concrete cable-stayed bridge with double inclined pylons, is taken as a sample application of this proposed technique. The results of cable tensions in this bridge illustrate the new adjustment technique is both accurate and efficient.
Similar content being viewed by others
Change history
23 April 2021
Change on PDF due to typeset error on Acknowledgment.
References
Alberto MBM, Luís MCS, João HJON (2015) Cable stretching force optimization of concrete cable-stayed bridges including construction stages and time-dependent effects. Structural and Multidisciplinary Optimization 51(3):757–772, DOI: https://doi.org/10.1007/s00158-014-1153-4
Barr PJ, Stanton JF, Eberhard MO (2005) Effects of temperature variations on precast, prestressed concrete bridge girders. Journal of Bridge Engineering 10(2):186–194, DOI: https://doi.org/10.1061/(ASCE)1084-0702(2005)10:2(186)
Chen CC, Wu WH, Liu CY, Lai G (2016) Damage detection of cable-stayed bridges based on the variation of stay cable forces eliminating environmental temperature effects. Smart Structures and Systems 17(6):859–880, DOI: https://doi.org/10.12989/sss.2016.17.6.859
Chen ZS, Zhang C, Zhou JT, Song J (2013) Study of cable force of construction control and alignment control of main girders for longspan railway cable-stayed bridges. Modern Applied Science 7(9): 47–56, DOI: https://doi.org/10.5539/mas.v7n9p47
Fang Z, Wang JQ (2012) Practical formula for cable tension estimation by vibration method. Journal of Bridge Engineering 17(1):161–164, DOI: https://doi.org/10.1061/(ASCE)BE.1943-5592.0000200
Fu YD, John TD (2004) Effect of differential temperature on a curved post-tensioned concrete bridge. Advances in Structural Engineering 7(5):385–397, DOI: https://doi.org/10.1260/1369433042863251
Irvine HM (1981) Cable structures. MIT Press, Cambridge, MA, USA, DOI: https://doi.org/10.1002/eqe.4290100213
Khan I, Shan DS, Li Q, Nan FL (2015) Temperature effect on continuous modal parameter identification of cable stayed bridge. International Association for Bridge and Structural Engineering 105(38):1–8, DOI: https://doi.org/10.2749/222137815818357683
Kim BH, Park T (2007) Estimation of cable tension force using the frequency-based system identification method. Journal of Sound and Vibration 304(3–5):660–676, DOI: https://doi.org/10.1016/j.jsv.2007.03.012
Macdonald JHG, Daniell WE (2005) Variation of modal parameters of a cable-stayed bridge identified from ambient vibration measurements and FE modeling. Engineering Structures 27(13): 1916–1930, DOI: https://doi.org/10.1016/j.engstruct.2005.06.007
Nugroho G, Priyosulistyo H, Suhundro B (2014) Evaluation of tension force using vibration technique related to string and beam theory to ratio of moment of inertia to span. Procedia Engineering 95:225–231, DOI: https://doi.org/10.1016/j.proeng.2014.12.182
Ren WX, Chen G, Hu WH (2005) Empirical formulas to estimate cable tension by cable fundamental frequency. Structural Engineering and Mechanics 20(3):363–380, DOI: https://doi.org/10.12989/sem.2005.20.3.363
Russell JC, Lardner TJ (1998) Experimental determination of frequencies and tension for elastic cables. Journal of Engineering Mechanics 124(10):1067–1072, DOI: https://doi.org/10.1061/(ASCE)0733-9399(1998)124:10(1067)
Wang XY, Chen MS, Sun HX, Yang Q (2013) Relationship of cable tension and temperature based on long-term monitoring data on the cable-stayed bridge. Applied Mechanics and Materials 405–408: 1716–1721, DOI: https://doi.org/10.4028/www.scientific.net/AMM.405-408.1716
Xu YL, Chen B, Ng CL, Wong KY, Chan WY (2010) Monitoring temperature effect on a long suspension bridge. Structural Control and Health Monitoring 17(6):632–653, DOI: https://doi.org/10.1002/stc.340
Zui H, Shinke T, Namita Y (1996) Practical formulas for estimation of cable tension by vibration method. Journal of Structural Engineering 122(6):651–665, DOI: https://doi.org/10.1061/(ASCE)BE.1943-5592.0000200
Acknowledgments
The authors gratefully acknowledge the support of Pearl River Science and Technology Nova Program of Guangzhou (No.201906010009), Fundamental Research Funds for the Central Universities, South China University of Technology (No.2019MS118) and National Natural Science Foundation of China (No.51678247, No.51878295).
Author information
Authors and Affiliations
Corresponding author
Rights and permissions
About this article
Cite this article
Ma, NJ., Gu, LX. & Peng, CL. An Adjustment Technique for Tensions in the Cables of Concrete Cable-Stayed Bridges considering the Effect of Cable-Girder Temperature Difference. KSCE J Civ Eng 25, 1806–1815 (2021). https://doi.org/10.1007/s12205-021-1145-z
Received:
Revised:
Accepted:
Published:
Issue Date:
DOI: https://doi.org/10.1007/s12205-021-1145-z